Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Wallkill, New York. Completed plans call for the renovation of a educational facility.
As of March 20, 2024, this project has not yet been awarded. A timeline for award has not yet been established. NOTICE IS HEREBY GIVEN, that sealed Bids, in duplicate, are sought and requested by the Board of Education, Wallkill Central School District Board of Education (hereinafter called "Owner"), for the Reconstruction to Wallkill Senior High School, John G. Borden Middle School, and Plattekill Elementary School. As bid security, each Bid shall be accompanied by a certified check or Bid Bond made payable to the Owner, in accordance with the amounts and terms described in the Instructions to Bidders. The Owner requires Bids comply with bidding requirements indicated in the Instructions to Bidders. The Owner may, at its discretion, waive informalities in Bids, but is not obligated to do so, nor does it represent that it will do so. The Owner also reserves the right to reject any and all Bids. The Owner will not waive informalities which would give one Bidder substantial advantage or benefit not enjoyed by all affected Bidders. Bids may not be withdrawn before 45 days following the Bid opening thereof, unless an error is claimed by the Bidder in accordance with the Instructions to Bidders. A. Work of this Contract includes, but is not limited to, the following descriptions: 1. Includes interior and exterior Electrical Lighting, Electrical Panel and Equipment connections and other systems traditionally recognized as Electrical work. This includes but is not limited to, all work shown on the Drawings, unless noted otherwise. It also includes administrative and coordination responsibilities. a. Drawings 1) Electrical (AE Drawings) 2. Coordination: a. Coordination with the work of all of the prime contractors. 1) Drawings a) All 3. Demolition: a. Removal of items as shown and/or required. b. Removal and disconnections of electrical devices in walls, ceilings, floors and site scheduled to be removed in portion of building and site where other work is being performed. c. Coordinate with the Construction Manager for necessary shutdowns and removals. Minimum of 48-hour notice will be required for any shutdown so that it doesn't affect other trades or the school district's operations. Shutdown may be required to be performed during second shift or weekend. d. Disconnect power to mechanical and plumbing equipment as required per the contract documents. Coordinate all work with HVAC Contractor. e. All cutting and patching necessary for work of this contract, including layout, sleeves, coring, debris removal, saw cuts, lintels (furnish and install), drywall work, plaster work, grouting, painting, ceiling removal and replacement, etc. 4. Temporary Facilities a. Provide Temporary Facilities indicated as Work of this Contract in Division 1 Section 01 50 00, "Temporary Facilities and Controls" b. Provide and maintain temporary electric power and lighting. c. Provide and maintain electric and internet service to Construction Manager's field office. d. Provide and maintain fire alarm and security system during replacement of the entrance doors and frames. 5. New Construction: a. Provide ALL wiring to ALL HVAC equipment as indicated on the drawings b. Provide new lighting fixtures indicated on the contract documents. c. All existing and new wire shall be properly supported above the ceiling per the contract documents. This includes all wire that is currently sitting on the ceiling tile and grid in areas where ceilings are be removed. d. Reinstall Items that were removed and relocated as per the contract documents. e. Provide all cutting and patching required for installing all electrical fixtures, devices, wire and conduit. f. Provide all fees required for inspections and permits. g. Provide and install all interior lighting and exterior lighting. All cutting and patching for lighting will be by this contractor. h. Provide support framing for Electrical equipment and conduits. i. Provide firestopping and sealing all electrical penetrations j. Provide owner training 6. General Requirements, including but not limited to, additional items specifically indicated as the Work of this Contract. 7. Provide multiple shift work as needed to complete work as shown on milestone schedule. It is the contractor's responsibility to include such shift work in their contract. The owner will not be responsible for paying any cost associated with shift work. Contractors will be required to provide a detailed schedule which will be approved by the CM for all shift work required prior to work commencing. B. The Work of the Electrical Work Contract includes but is not limited to the Work that is specified in the Project Manual(s) and as shown on the drawings that form the contract plans. The Contractor is directed to examine all plan drawings since certain details and/or notes may appear anywhere therein that apply to his/her particular work. This prime contract is defined as, and includes, all Sections in the Divisions indicated by reference, and specific Sections noted: 1. 2. Division 1 -General Requirements all Sections, including Temporary Facilities indicated 3. Section 07 84 13, Penetration Firestopping, as required for the Work of this Contract 4. Section 07 84 43, Joint Firestopping, as required for the Work of this Contract 5. Section 07 92 00, Joint Sealers, as required for the Work of this Contract 6. Division 23 - Mechanical as applicable for Equipment Connections 7. Division 26 - Electrical - All Sections 8. Division 27- Communications- All Sections 9. Division 28 - Electronic Safety and Security- All Sections 2) Secondary Contact - only if primary is not available: Mr. Brian Devincenzi, Assistant Superintendent for Support Services, 1500 State Route 208, Wallkill, New York, 12589, Phone (845) 895-7102.
Award
Educational
$832,500.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 7, 2024
May 6, 2024
90 Robinson Dr, Wallkill, NY
Related To This Project
Wallkill, NY
Bid Date: Mar 07 2024
Wallkill, NY
Bid Date: Mar 07 2024
Wallkill, NY
Bid Date: Mar 07 2024
Wallkill, NY
Bid Date: Mar 07 2024
Wallkill, NY
Bid Date: Mar 07 2024
Wallkill, NY
Bid Date: Mar 07 2024
Wallkill, NY
Bid Date: Mar 07 2024
Wallkill, NY
--
Wallkill, NY
Bid Date: Mar 07 2024
Wallkill, NY
Bid Date: Feb 07 2024
Wallkill, NY
--
Wallkill, NY
Bid Date: Dec 14 2023
Wallkill, NY
Bid Date: Dec 28 2023
Wallkill, NY
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.