EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 17, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Pittsburgh, Pennsylvania. Completed plans call for the renovation of a educational facility.

ITEM NO. 1: TWO-HOUR ASBESTOS AWARENESS TRAINING REQUIREMENT A. The Contractor, and its subcontractor(s), are required to provide at least two hours of asbestos awareness training to all their employees, who perform on-site work, prior to being permitted access to the Pittsburgh Public Schools (PPS) facilities. The training and its curriculum shall comply with the Environmental Protection Agency's (EPA) Asbestos Hazard Emergency Response Act (AHERA) [40 CFR 763.92] and/or Occupation Safety and Health Administration (OSHA) [29 CFR 1910.1001 (j)(7); 1926.1101 (k)(9)(vi)] requirements for a two hour asbestos awareness program for maintenance personnel, who work in a facility that contain asbestos, whether or not they are required to work with asbestos containing building material. B. PPS Asbestos Management Plan, which identifies various asbestos containing materials and their locations, is available for review in the custodian's office. ITEM NO. 2: COMPLIANCE WITH THE EPA'S LEAD RENOVATION, REPAIR & PAINTING (RRP) RULE, 40 CFR PART 745 A. The Contractor, and its subcontractor(s), who perform renovation, repair and painting in the PPS facilities, must be certified by EPA as Certified Firms, and must use Certified Renovators who are trained by EPA-approved training provider to follow lead-safe work practices. B. The Contractor must submit copies of the following certifications to the Consultant (Architect, Engineer or Construction Manager), prior to the start of work in PPS workplaces: 1. 'Certified Firm' - EPA issued certifications for the Contractor, and its subcontractor(s). 2. 'Certified Renovators' - EPA accredited certifications for the employees of the contractor and its subcontractor(s). At least one employee of each of the Contractor and the subcontractor(s) must have this certification. C. The Contractor, and its subcontractor(s), must comply with all the requirements of the EPA's RRP Rule, 40 CFR Part 745, and shall submit a copy of the recordkeeping maintained by its employee and/or the subcontractor(s), as required by the RRP rule, to the Consultant (Architect, Engineer or Construction Manager) prior to the project close-out. ITEM NO. 3: ASBESTOS AND LEAD FREE PRODUCT USAGE CERTIFICATION The Contractor is responsible to ensure and certify that all products used in the Pittsburgh Public School facilities for renovation, repair and painting are free of and do not contain asbestos and lead. Accordingly, Material Safety Data Sheets (MSDS) for all the products shall be submitted to meet the requirements of the project specifications. Off-site work shall be started on the Project no later than ten (10) days after the execution of a Contract with the Owner or as otherwise directed in writing. On-site work shall start June 20, 2024. The work shall be substantially completed and ready for Owner use on August 11, 2024 Punch list items must be completed 30 days after substantial completion.

Award

Educational

$347,400.00

Public - City

Renovation

28

13

6

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Wiring Devices
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
127
Bidding Soon
1,016
All Active Projects
481
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2024

June 20, 2024

img_map_placeholder

Multiple Locations, Pittsburgh, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Water Cooler Replacement Phase 7 At Various Buildings

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.