BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fire / police facility in Grand Falls-Windsor, Newfoundland. Completed plans call for the renovation of a fire / police facility.

Closing Time: 2:30 PM (NT) ** Please note that there has been 7 addendum issued for this project. ** Question Acceptance Deadline Feb 21, 2024 02:30 PM NST .1 All demolition work as indicated on drawings. .2 Remove fuel tank and associated piping and dispose of in accordance with Canadian and Newfoundland environmental regulations. .3 Supply and installation of new Stand-By Diesel Generator and Automatic Transfer Switch. .4 New generator to be located on new concrete pad. .5 New generator to be connected to the existing fire alarm system for monitoring purposes throughout the building. .6 Provide new single line diagram to reflect 100% of all existing and new electrical equipment. Contractor is responsible to verify all panel sizes including voltage and phase. All panelboard feeders are to be confirmed and identified. .7 All panelboard directories that are affected in this contract shall be revised and re-typed. .8 Supply and installation of new Service Entrance Board, panels and disconnects. .9 The removal of existing electrical service and the installation of new. .10 Coordination with NF Power. .11 New chain link fence around new Stand-By Generator. .12 Provide Arc-Flash and Load Coordination Study for complete distribution system including all existing and new electrical equipment. Work of this Contract comprises of mechanical and electrical services for the removal of the existing stand-by generator, manual transfer switch, associated fuel tank including all piping, etc. and all associated wiring and conduit as indicated. As well, the supply and installation of new stand-by generator, automatic transfer switch and all conduit and wiring as indicated. Contractor shall be responsible to clean and abate any asbestos containing material (ACM), or related debris if necessary to allow for the removal and installation of all Mechanical and Electrical devices, conduits, wiring, piping, etc. as indicated on the drawings. Any work that disturbs or removes asbestos must be executed by registered asbestos abatement contractors trained in accordance with OH&S Asbestos Abatement Regulation on asbestos clean-up and abatement work. Contractor shall carry the proper environmental insurance. Any work stoppage due to discovery of asbestos will not be grounds for additional compensation. The discovery of asbestos must be brought to the attention of the project manager. If Asbestos abatement is necessary, contractor shall engage and pay for services of an experienced Environmental Consultant to perform air monitoring and/or inspection and any other related tasks as required. Official bid documents must be obtained from www.bgis.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Fire / Police

Public - Federal

Renovation

15

18

19

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
3
Bidding Soon
97
All Active Projects
43
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 4, 2024

April 2, 2024

img_map_placeholder

100 Trans-Canada Hwy, Grand Falls-Windsor, NL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.