Site work for a water / sewer project in Lebanon, New Hampshire. Completed plans call for site work for a water / sewer project.

The City of Lebanon reserves the right to reject any and all Bids and to waive any irregularity in Bidding. The successful Bidder will be required to furnish the necessary Bonds and Insurance Certificates. The City will award this project based on the City's discretion and may or may not include any or all bid alternatives. All work included in this bid is dependent upon the bid amounts and available funding. Actual quantities are subject to change and will be based upon actual field measurements taken during construction. The City of Lebanon, New Hampshire is seeking bids for a project consisting of furnishing and installing 800 LF of 10-inch C900 PVC pressure sewer along Riverside Drive to Bank Street Extension including fittings and interconnections to the existing system. The project also includes installing 85 LF of 12-inch TR Flex DI pipe under the Packard Bridge. The City of Lebanon has pre-purchased the TR Flex DI pipe and the pipe is stored at the Lebanon Wastewater Treatment Plant. The Contractor will be required to pick up the pipe at the Wastewater Treatment Plant. The existing pressure sewer shall remain in service to provide continuous service until the new pressure sewer is constructed, pressure tested, and ready for service. At that time, the system will be shutdown, the interconnections shall be made, and the pressure sewer will be placed back in service. Riverdale Drive Pressure Sewer Realignment Project In the late 1980s, the City of Lebanon expanded its municipal wastewater system to serve residents along Route 4A and the Town of Enfield, New Hampshire. A combination of gravity sewers, pump stations, and forcemains deliver wastewater to the intersection of Route 4A and Route 4 where the system transitions into a pressure sewer. The pressure sewer follows Mill Road downhill to Riverside Drive, crosses the under the Mascoma River upstream of the Packard Bridge, and terminates at a control valve structure near Winona Farms Circle. The control valve opens when a preset pressure is reached and closes after preset time period. Last year, the 10" ductile iron pressure sewer main experienced substantial corrosion on the exterior of the pipe due to an aggressive environment near its crossing of Blodgett Brook. The Department of Public Works developed a Capital Improvement Project to realign the pressure sewer from the Macoma River crossing, across the Packard Bridge, to the existing pressure sewer along Bank Street Extension proposing polyvinyl chloride (PVC) pipe. This pipe material will be inert to the aggressive environment. The project consists of furnishing and installing 800 LF of 10-inch C900 PVC pressure sewer along Riverside Drive to Bank Street Extension including fittings and interconnections to the existing system. The project also includes installing 85 LF of 12-inch TR Flex DI pipe under the Packard Bridge. The City of Lebanon has pre-purchased the TR Flex DI pipe and the pipe is stored at the Lebanon Wastewater Treatment Plant. The Contractor will be required to pick up the pipe at the Wastewater Treatment Plant. The existing pressure sewer shall remain in service to provide continuous service until the new pressure sewer is constructed, pressure tested, and ready for service. At that time, the system will be shutdown, the interconnections shall be made, and the pressure sewer will be placed back in service. The impacted sections of Riverdale Drive and Bank Street Extension will be trench patched and then overlayed with a full width wearing course of bituminous pavement. Question Submission Deadline:February 28, 2024, 12:00pm Contact Information Project Contact: Rod Finley City Engineer 193 Dartmouth College Highway Lebanon, NH 03766 Email: rod.finley@lebanonnh.gov Phone: (603) 448-3112 Procurement Contact: Rod Finley City Engineer 193 Dartmouth College Highway Lebanon, NH 03766 Email: rod.finley@lebanonnh.gov Phone: (603) 448-3112 Substantial Completion:July 12, 2024 Final Completion and Acceptance:July 26, 2024

Post-Bid

Water / Sewer

$235,000.00

Public - City

Site Work

9

14

2

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
55
Bidding Soon
892
All Active Projects
358
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2024

March 15, 2024

img_map_placeholder

Riverside Dr, Lebanon, NH


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.