BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a transportation facility in Marthasville, Missouri. Conceptual plans call for site work for a transportation facility; and for paving for a transportation facility.

The City of Washington, Missouri ("Sponsor"), is hereby soliciting statements of qualifications and experience from qualified consultants for airfield development projects at Washington Regional Airport. Projects may be subject to future receipt of Federal funding under the Federal Aviation Administration (FAA) Airport Improvement Program, as administered by the Missouri Department of Transportation (MoDOT) through the State Block Grant Program (SBGP) The required services include, but are not limited to, engineering services for preliminary, design, bidding, and construction phases and incidental special services including geotechnical, preparing categorical exclusion documentation, as-built ALP updates, and surveying. The consultant should provide the name(s) of preferred firm(s) for any work which is likely to be sub-consulted. Sub-consultant changes can occur with Sponsor approval. At the Sponsor's discretion, this selection can be retained for projects initiated within five years or until all projects are complete. Projects other than those listed above will require a new solicitation except as allowed in FAA Advisory Circular 150/5100-14 paragraph 2.7.2 (4). Disclosure: Under a previous agreement, Crawford, Murphy, & Tilly assisted the Sponsor with preparation of their CIP and the above cost estimates. A qualification based selection process conforming to FAA Advisory Circular 150/5100-14 will be utilized to select the most qualified firm. Selection criteria will include, but may not be limited to: o Recent experience in airport projects o Capability to perform all aspects of project o Ability to meet schedules within budget o Knowledge of FAA/MoDOT design and construction standards o Knowledge of FAA/MoDOT regulations, policies and procedures o Quality of previous airport projects undertaken o Personnel experience and qualifications o Familiarity with, and proximity to the project o An implemented Affirmative Action Program Fees will be negotiated for projects as federal funds become available. Consultants shall not include fee or cost information when responding to this solicitation. Prospective consultants are advised that applied overhead rates must be in accordance with the cost principles established within Federal Regulation 48 CFR Part 31, Contract Cost Principles and Procedures. After selection, the successful firm will be required to submit a copy of their current overhead rate audit certification or MoDOT pre-approval. This contract is subject to all applicable Federal Provisions, which include, but are not limited to: o Title VI of the Civil Rights Act of 1964 o Section 520 of the Airport and Airway Improvement Act of 1982 o DOT Regulation 49 CFR Part 20 - Lobbying and Influencing Federal Employees o DOT Regulation 49 CFR Part 26 - Disadvantaged Business Enterprises Participation o DOT Regulation 49 CFR Part 30 - Foreign Trade Restriction Clause DOT Regulation 2 CFR Part 180 and 1200 - Government Debarment and Suspension o DOT Regulation 2 CFR 200 Appendix II, including Access to Records and Reports, Breach of Contract Terms, Rights to Inventions, and Termination of Contract The consultant should also provide an affidavit of compliance with the federal work authorization program and a copy of the firm's E-Verify Memorandum of Understanding. Questions regarding this solicitation can be directed to Sal Maniaci, Community and Economic Development Director at 636-390-1004. 1. Runway Extension and widening. Estimated cost = $3,000,000. 2. Design and reconstruction of existing runway. Estimated cost = $9,200,225 3. Re-mark airfield and pavement maintenance. Estimated cost = $350,000 4. Design and Reconstruction of parallel taxiway and connectors. Estimated cost = $6,203,000

Conceptual

Transportation Terminals

$18,753,225.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
67
Bidding Soon
903
All Active Projects
340
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

img_map_placeholder

12958 State Hwy 47, Marthasville, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.