Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and new construction of a water / sewer project in Milwaukee, Wisconsin. Completed plans call for site work for a water / sewer project; for the demolition of a water / sewer project; and for the construction of a water / sewer project.
**As of April 25,2024 has not yet been awarded. A timeline for the award has not yet been established.** Phase 1 Motor Control Center Replacements At Jones Island Water Reclamation Facility Question Deadline 03/06/2024 All questions related to this proposed contract, pre-bid presentation, site tour or interested bidders list must be directed in writing to Millie Neidhardt, eneidhardt@mmsd.com no later than 5 days before the bid opening date. Questions received after this deadline or directed to other contacts at the District will not be recognize Davis-bacon Federal Prevailing Wage Rates Apply to This Contract. A pre-bid presentation will be posted under contract J06081C01 on Quest CDN and the District's Procurement Opportunities web page no later than 4:00pm on February 15th, 2024. The purpose of the presentation is to outline the contract scope and convey details about the bidding requirements and expectations. All potential bidders are encouraged to view the presentation at their convenience. For information regarding this project contact: Millie Neidhardt, eneidhardt@mmsd.com The project contemplated consists of the construction of the following: o Demolition of 30 existing 480V Motor Control Centers (MCCs); one existing 13.2kV - 480V load center unit substation; and one existing 13.2kV - 4.16kV motor control unit substation. o Furnishing and installing 21 new 480V MCCs; one new automatic transfer switch and 480V switchboard; one new 13.2kV - 480V load center unit substation; and one new 13.2kV - 4.16kV motor control unit substation. o Furnishing and installing temporary electrical systems to maintain plant operations during construction. o Construction of building modifications and HVAC system improvements. o Payment to provide Generator Synchronization Controller specified in specification 16346, section 2.3, plus installation and programming as outlined in specification 16346, section 3.3 will be made at the lump sum amount stated in Additive Work Item No. 2. No payment will be made for Additive Work Item No. 2 unless the Engineer provides written approval for the work outlined in specification 16346, sections 2.3 and 3.3. o All other work shown on the plans and specifications This Section describes the project in general and provides an overview of the extent of the work to be performed. Detailed requirements and extent of work is stated in the applicable Specification Sections and shown on the Plans. B. DESCRIPTION OF THE PROJECT (12/96) The Plans for the construction of the Phase 1 Motor Control Center Replacements at Jones Island Water Reclamation Facility, Contract J06081C01 consist of 119 sheets dated January 2024. The location of the work is shown on Sheet 4 of 119. Work covered by these Contract Documents in general covers the construction of the following facilities: o Demolition of 30 existing 480V Motor Control Centers (MCCs); one existing 13.2kV - 480V load center unit substation; and one existing 13.2kV - 4.16kV motor control unit substation. o Furnishing and installing 21 new 480V MCCs; one new automatic transfer switch and 480V switchboard; one new 13.2kV - 480V load center unit substation; and one new 13.2kV - 4.16kV motor control unit substation. o Furnishing and installing temporary electrical systems to maintain plant operations during construction. o Construction of building modifications and HVAC system improvements. o All other work shown on the plans and specifications. C. REASONABLY IMPLIED PARTS OF THE WORK SHALL BE DONE THOUGH ABSENT FROM SPECIFICATIONS (12/96) Any part or item of the work which is reasonably implied or normally required to make each installation satisfactorily operable shall be performed by the Contractor and the cost thereof shall be included in the applicable unit prices or lump sum prices bid for the work. It is the intent of these Specifications to provide the Owner with complete operable systems, subsystems, and other items of work. All miscellaneous appurtenances and other items of work that are incidental to meeting the intent of these Specifications shall be considered as having been included in the applicable unit prices or lump sum prices bid for the work even though these appurtenances and items may not be specifically called for in the Specifications. D. PAYMENT (6/20) Payment for the work summarized in this Section will be included as part of the payment for the work covered and defined in other Specification sections.
Bid Results
Water / Sewer
$8,790,210.00
Public - County
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2024
May 31, 2024
700 E Jones St, Milwaukee, WI
Related To This Project
Milwaukee, WI
Bid Date: Feb 23 2024
Milwaukee, WI
Bid Date: Feb 23 2024
Milwaukee, WI
Bid Date: Feb 22 2024
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Mar 04 2024
Milwaukee, WI
Bid Date: Feb 21 2024
Milwaukee, WI
Bid Date: Mar 07 2024
Milwaukee, WI
Bid Date: Mar 06 2024
Milwaukee, WI
Bid Date: Mar 06 2024
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Feb 23 2024
Milwaukee, WI
Bid Date: Feb 23 2024
Milwaukee, WI
Bid Date: Feb 13 2024
Milwaukee, WI
Bid Date: Feb 28 2024
Milwaukee, WI
Bid Date: Mar 06 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.