Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Chapel Hill, North Carolina. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The Project Manager for this project is Greg Ling, Streets Supervisor, Public Works Department, Town of Chapel Hill. All requests for interpretations related to this RFB must be submitted in writing to the Project Manager at gling@townofchapelhill.org by 3:00 pm on Thursday, February 15, 2024. All responses to timely submitted requests for interpretations will be published in the form of an addendum on the Town's website on Friday, February 16, 2024. For questions on the bidding procedures, contact the Town's Purchasing Division at 919-969-5022. Project Summary: This project consists of patching,milling, and resurfacing of selected Town streets. Contacts: For Questions about the Proposed Project: Greg Ling, Streets Supervisor, Project Manager Public Works Town of Chapel Hill 405 Martin Luther King, Jr. Blvd. Chapel Hill, NC 27514 Email: gling@townofchapelhill.org For Questions about BiddingProcedures: Town of Chapel Hill PurchasingDivision 919-969-5022 Minority and Women Owned Enterprises. Bidder shall make a good faith effort to ensure that, whenever possible, subcontracts are awarded to minority and women's business enterprises in accordance with Town policy. See General Conditions for additional information. DESCRIPTION OF WORK PAVING The production, delivery, placement, and compaction of all bituminousmaterial shall be in accordance with Section 610 of the Standard Specifications. All paving shall be the appropriate Surface Mix, Type S9.5B or S9.5C, Intermediate Mix, Type I19.0C, or Base Mix, B25.0C. A currently approved North Carolina Department of Transportation job mix formula shall be used for all bituminous construction. Tack shall conform to Section 605, Asphalt Tack Coat, of the NCDOT Standard Specifications for Roads and Structures. Tack shall only be applied beyond the area to be paved on a given day or night. Trackless tack is permitted. Trucks shall be fitted with appropriate measuring devices such that the quantity of tack applied to an area may be verified. Tack shall be spread with the spray bar on the tack truck. Use of hand wands to spray tack is limited to areas not accessible to the truck spray bar. There will be no separate payment for this item. MILLING STREETS The existing pavement shall be milled in a manner which will restore the pavement surface to a uniform longitudinal profile and cross section at the locations specified. The Contractor shall mill intersections and other irregular areas as indicated by the Public Works Director. The Contractormay elect to make multiple cuts to achieve the required depth or cross slopes as specified. Longitudinal profile of the milled surface shall be established by a mobile string line on the side of the cut nearest the centerline of the road or as directed by the Public Works Director. The cross slope of the milled surface shall be established by an automatic cross slope control mechanism or by a second skid sensing device located on the opposite edge of the cut. The Public Works Director may waive the requirements for automatic grade and cross slope controls where conditions warrant. The milling equipment shall be operated in such a manner as to prevent damage to underlying pavement structure, utilities, drainage facilities, curb and gutter, pavement surfaces outside the milled area, and any other appurtenances. The milled pavement surface shall be reasonably smooth and free of excessive scarification marks, gouges, ridges, continuous grooves, or other damage as determined by the Public Works Director. Any leveling or patching required as a result of negligence by the Contractor shall be repaired with hot bituminous plant mix at no cost to the Town. The Contractor shall coordinate the adjustment of manholes,meter boxes, and water valves with the milling operation. It is the responsibility of the Contractor to clean the streets after milling. The milled pavement surface shall be thoroughly cleaned of all loose aggregate particles, dust, and other objectionable material by use of power brooms, blowers, power vacuums, or other means. The milled asphalt shall be hauled off at the expense of the Contractor. The Town has the option to retain up to 50% of the millings for their use and will provide a stockpile site at no additional cost to the Town. The Contractor shall not stockpile or store any waste or millings on the streets or rights-of-way in Chapel Hill. Pavement removal operations shall be conducted to effectivelyminimize the amount of dust being emitted. The operation shall be planned and conducted so that it is safe for persons and property adjacent to the work including the traveling public. The removal of the existing pavement shall be to the depth required by the plans or contract. In the event it is altered by more than one inch a pro-rated adjustmentmay be requested by either party.
Award
Roads / Highways
$721,350.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 27, 2024
April 1, 2024
Multiple Locations, Chapel Hill, NC
Related To This Project
Chapel Hill, NC
--
Chapel Hill, NC
Bid Date: Feb 20 2024
Chapel Hill, NC
--
Chapel Hill, NC
Bid Date: Apr 16 2024
Chapel Hill, NC
--
Chapel Hill, NC
Bid Date: Apr 22 2024
Chapel Hill, NC
Bid Date: Mar 12 2024
Chapel Hill, NC
--
Chapel Hill, NC
Bid Date: Mar 11 2024
Chapel Hill, NC
Bid Date: Mar 13 2024
Chapel Hill, NC
--
Chapel Hill, NC
--
Chapel Hill, NC
Bid Date: Feb 01 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.