BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 5, 2024 at 8:00 PM

Updated June 10, 2025

Site work for a water / sewer project in Fort Smith, Arkansas. Completed plans call for site work for a water / sewer project.

Arkansas Highway 45 Utility Relocation City: Fort Smith County: Sebastian State/Province: AR Site Directions: Arkansas Highway 45, between US Highway 71 and US Highway 255 (Zero Street) The project includes approximately 15,900 linear feet of water line from 6 to 24 inches in diameter and 5,400 linear feet of sanitary sewer line from 8 to 15 inches in diameter to facilitate the construction of Hwy. 71 - Hwy. 255, (Ft. Smith)(S), Route 45 by the Arkansas Department of Transportation, Job No. 040713. Pipe lines will be installed by conventional open cut trenching and dry bore encasement pipe.

Award

Water / Sewer

$31,108,898.00

Public - City

Site Work

186

8

11

6

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
72
Bidding Soon
762
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2024

May 20, 2024

Project location map

State Hwy 45, Fort Smith, AR

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.