Site work and paving for a civil project in Madison, Indiana. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This project consists of a unit price bid for hot mix asphalt surface overlays of existing county roads at various locations in jefferson county, and other miscellaneous and related items. After review and award of a contract, the Owner will provide a "Notice to Proceed" to the Contractor for the specific project. Contractor will then have 10 working days after said "Notice to Proceed" to commence construction and until September 1, 2024 to achieve Substantial Completion and October 1, 2024 to complete all work for the project. Contractor will be assessed $300.00 a day liquidated damages for any work remaining over and above either of the specified contract completion dates. Payment to be made on a standard monthly claim basis, with 10% retainage, and said retainage may be held up to three months after the successful completion of this contract. There is no retainage reduction for this project. Copies of the Contract Documents are on file for review in the Office of the Owner (JEFFERSON COUNTY AUDITOR'S OFFICE, 300 East Main Street, Room 101, Madison, Indiana 47250). Partial sets will not be available. Only those plan holders registered through the Engineer will be allowed to submit a bid for the project. Each bid must be accompanied by a Bid Bond or Certified Check in a sum equal to 10% of the amount of the bid unless otherwise specified, and a completed Non-Collusion Affidavit. Bid prices must be firm for a period of ninety (90) days from the bid opening date. Should a successful bidder withdraw his bid, or fail to execute a satisfactory contract within ten (10) days after notice of acceptance of his bid, the owner may declare the Bid Security forfeited as liquidated damages, not as penalty. The successful bidder shall furnish a Performance and Labor and Materials Payment Bond in an amount equal to one hundred percent (100%) of the contract sum with an approved surety company. Said bond shall remain in full force and effect for a period of one (1) year after date of final acceptance of the work.

Post-Bid

Roads / Highways

$370,000.00

Public - County

Paving, Site Work

21

12

2

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
54
Bidding Soon
1,458
All Active Projects
585
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2024

April 4, 2024

img_map_placeholder

Multiple Locations, Madison, IN


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.