BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Calgary, Alberta. Contact the soliciting agency for additional information.

Reference Number 0000264513 Question Acceptance Deadline 2024/03/04 12:00:00 AM MST Bid Intent Deadline 2024/03/01 12:00:00 AM MST Pricing Lump sum The project includes construction and maintenance of landscaping for several Projects located in the Town of Canmore, comprised of: Part 1 - Teepee Town Phase 2A The Work includes supply and installation of topsoil; sod; L.I.D. soil structure and plantings; shrub beds; and tree plantings along the east side of Bow Valley Trail from Benchlands Trail to the CP pedestrian crossing, 2 Ave from Hospital Place to the CP pedestrian crossing, and Hospital Place from Bow Valley Trail to 1 Avenue. The Contractor will be required to coordinate with others to access project areas and begin landscape installation as utility and roadworks construction are completed. Landscape installation is expected to begin in 2024 in some portions of the site and may extend into the 2025 season. The maintenance and warranty period for this work will extend to two years after completion of the installation. Detailed design drawings to be provided prior to the start of this Work. Part 2 - West Bow River Path Tree Installation The Work includes installation of several new trees and shrubs to be planted in specific locations as directed by the Town. Plant installation is expected to occur in spring 2024. There is no warranty period for this work. Detailed design drawings to be provided prior to the start of this Work. Part 3 - Bow Valley Trail at CP Pedestrian Crossing The Work includes removal of dead plant material and existing trees and installation of new shrub bed materials, and bark mulch replenishment in the planting areas along Bow Valley Trail at the pedestrian railway crossing. The extent of dead tree and shrubs replacements shall be determined by the Contractor on site and approved by the Town prior to replacement. The maintenance and warranty period for this work will extend to two years after completion of the installation. Detailed design drawings to be provided prior to the start of the installation of new plant material. Provisional - Part 4 - Landscape Maintenance The Work includes turf repairs, weeding, pruning, mulch supply and install, plant replacements, tree pruning and watering. There is no warranty period for this work. Specific requests and instructions for maintenance Work will be provided at least five working days prior to expected start date of maintenance activities. Watering requests and instructions will be provided at least two working days prior to required watering by Contractor. Provisional - Part 5 - Other Landscape Work The Work includes landscape construction at the discretion of the Town of Canmore. Scope and schedule to be agreed to by both parties in accordance with change management procedures in Section 5.4.11 prior to commencement of additional Projects. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Sub-Bidding

Sidewalks / Parking Lot

Public - City

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
23
Bidding Soon
514
All Active Projects
188
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 12, 2024

April 15, 2024

img_map_placeholder

Multiple Locations, Calgary, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.