BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a road / highway in Dania Beach, Florida. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

The city of dania beach, florida, is seeking bids from qualified contractors for a project known as "replacement of solar street light panels (re-bid). The City intends to replace solar panels in 245 solar street lights. The project requires the removal of current solar panels and their metal backing, and installation of new monocrystalline solar panels. Any interpretations, clarifications or additional information not disclosed in this Bid and determined to be necessary by the Owner in response to questions, will be issued by means of addendum or addenda, which addendum or addenda will be posted to the City website for all interested persons identified by the Owner as having received the Bid Documents. The Bidder is required to check these sites to see if there has been any addendum or addenda posted for this Bid. Only questions answered and information supplied by means of such addendum or addenda will be considered as binding. Oral interpretations, clarifications or other information will have no legal and binding effect. Bids will be publicly opened and read aloud immediately after the submission deadline on the Bid due date referenced above using RingCentral meeting software, in the presence of the City Clerk or designee on the above stated date. Award of a contract will be made at a subsequent City Commission meeting All bidders are advised that the City has not authorized the use of the City seal by individuals or entities responding to City bids. Bidders shall demonstrate successful performance of projects of a similar magnitude, scope and value as this project. The City Commission of the City of Dania Beach reserves the right to reject any and all bids, to waive any informality in a bid and to make an award in the best interests of the City, as Owner. The Contractor shall achieve Substantial Completion not later than one hundred fifty (150) calendar days and Final Completion of the entire Work not later than one hundred eighty (180) calendar days, each commencing with the date set forth in the NOTICE TO PROCEED as issued by the City, subject to adjustments of this Contract Time as provided in the Contract Documents.

Award

Roads / Highways

$371,726.00

Public - City

Outdoor Lighting, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
45
Bidding Soon
1,087
All Active Projects
481
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2024

April 3, 2024

img_map_placeholder

Multiple Locations, Dania Beach, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.