BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Rock, Michigan. Design plans call for site work for a bridge / tunnel.

As of June 21, 2024, an engineer has been selected for the project. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: The Michigan Department of Natural Resources (MDNR) Forest Resources Division (FRD) is requesting professional engineering services for the design and construction of a culvert replacement on the North Deadhorse Road over the Deadhorse Creek. The Deadhorse Creek is a Type 1 Designated Trout Stream and a tributary of the Rapid River, located NE of Rock in Delta County. There are currently two existing undersized culverts in this location. The main culvert is undersized and perched and the second culvert acts as an overflow for the main culvert. The MDNR FRD is proposing to replace the two undersized culverts with a larger culvert or box culvert as recommended by the PSC based on budget and lifespan. The DNR has a local barrow pit located near the project site and a gravel stockpile to be utilized during construction. At this time, it is not anticipated that the new culvert structure will require inspection by an MDOT bridge inspector prior to opening for use but if the sizing becomes great enough during design to be classified as a bridge the PSC shall assist in transmittal of contract documents, submittals, as-builts, and any other requested documents to the MDOT bridge unit. The MDNR would like to minimize the time that the road is closed, and requests that the PSC consider construction sequencing and diversion/bypass requirements in the design. The project is all state land in the project vicinity and the road can be closed on both sides of the project. There is one private camp that utilizes Deadhorse Road for access, but they have alternate access from the north. 3/6/2024 at 12:00 PM via e-mail to Jeff Barsch, barschj@michigan.gov. Project is to be designed/permitted during summer of 2024, bid in fall of 2024 with construction in spring/summer of 2025. Interested firms must email Jeff Barsch at barschj@michigan.gov no later than February 27, 2024, to request a meeting invite. Your email should include names of all attendees, along with their email address

Design

Bridges / Tunnels

$100,000.00

Public - State/Provincial

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
9
Bidding Soon
57
All Active Projects
23
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2024

img_map_placeholder

North Deadhorse Road, Rock, MI

New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.