BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 23, 2024 at 8:00 PM

Updated March 24, 2024

Site work and paving for a mixed-use development in Detroit, Michigan. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

Shallow concrete deck overlay, bridge sidewalk repairs, substructure patching and approach work on M-39 Service Drive over the north branch of Ecorse River and Reeck Road over Sexton-Kilfoil Drain in the city of Allen Park, Wayne County. This is a Local Agency project. Net classification required for this project - 1627 Fa Control Sec Job No Federal No BFP 82000 212268A 24A0240 MCS 82000 214711A N/A MI DOT - 039 - Shallow Concrete Deck Overlay, Bridge Sidewalk Repairs, Substructure Patching and Approach Work on M-39

Award

Bridges / Tunnels

$1,549,817.00

Public - State/Provincial

Paving, Site Work

113

5

10

7

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
346
Active Projects
170
Bidding Soon
2,646
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2024

April 30, 2024

Project location map

M-39, Detroit, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.