BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Portland, Maine. Completed plans call for site work for a water / sewer project.

Sealed bids for the construction of Market St/Waterman Dr ROW/Thomas St ROW Water Main Replacement Project in South Portland The work shall generally consist of, but is not necessarily limited to, 1. Installation of approximately 682 feet of 8-inch ductile iron water main. 2. Installation of approximately 187 feet of 8-inch PVC water main. 3. Retirement of an existing tee in the Waterman Drive and Broadway intersection. 4. Installation of temporary water main and other related appurtenances along the water main Each proposal must be accompanied by Proposal Guaranty in form of certified check or bid bond in amount of five percent (5%) of the total amount of the bid. A performance bond in an amount equal to one hundred percent (100%) of the contract price, and labor and material payment bonds in like amount will be required prior to execution of the Agreement. Bidder agrees to begin and complete work with the time frame outlined in the Agreement. The bidder is responsible for incorporating addenda into their Bid and referencing the number and date on Article 3 - Bidder's Representations of the Bid form. The Portland Water District will not post Bid Addenda any later than two (2) days prior to the bid opening without individually notifying all plan holders. No bids may be withdrawn within sixty (60) days after date of opening thereof. Right is reserved to refuse or reject any or all bids or to waive any informality in proposals received and to award work at the discretion of the General Manager acting in the best interests of the Portland Water District. Electronic copies of contract documents may be obtained upon request, contact Wesley Gilbert, Purchasing Agent, 207-774-5961 ext.1007, wgilbert@pwd.org to obtain information regarding access to the files. (Paper copies are not available.) The work shall generally consist of, but is not necessarily limited to, 1. Installation of approximately 682 feet of 8-inch ductile iron water main. 2. Installation of approximately 187 feet of 8-inch PVC water main. 3. Retirement of an existing tee in the Waterman Drive and Broadway intersection. 4. Installation of temporary water main and other related appurtenances along the water main.

Award

Water / Sewer

$549,484.00

Public - City

Site Work

9

12

8

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
32
Bidding Soon
739
All Active Projects
255
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2024

April 15, 2024

img_map_placeholder

Multiple Locations, Portland, ME


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.