BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 10, 2024 at 8:00 PM

Updated April 11, 2024

Demolition and site work for a mixed-use development in Van Buren Twp, Michigan. Completed plans call for the demolition of a playground / park / athletic field; and for site work for a playground / park / athletic field.

Reference Number 0000342770 1. Demolition of each structure listed above. 2. Removal of all materials from the demolition at each location. This includes all building materials, cement from foundations and/or slabs, tree debris, logs, stumps (as needed). 3. Offsite disposal of all materials removed from the demolition areas. 4. Restoration of the ground area where demolition took place. This includes backfilling all open holes with clean fill dirt and grade all holes and excavations that were part of the demolition areas. Seed and mulch all backfilled and graded areas with a grass seed mix appropriate for the area. Note: The Service Garage Trash Bin will not be seeded. This restoration needs to match the gravel road of surrounding area. Please contact Jason Locke, Director of Parks, at 734-643-9495 or jlocke@vanburen-mi.org if you have any questions.

Award

Playgrounds / Parks / Athletic Fields

$22,800.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
337
Active Projects
131
Bidding Soon
2,548
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2024

April 4, 2024

Project location map

Multiple Locations, Van Buren Twp, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.