EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 4, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Warrior, Alabama. Completed plans call for site work for a water / sewer project.

Awarded to Viking Painting LLC Painting and Repairs to Cahaba Cove and Warrior Potable Water Tanks The Water Works Board of the City of Birmingham is soliciting these two tank projects to be performed by one contractor in a tight timeframe before Summer 2025. Total quoted cost of both bids together will be used to determine contract award. Schedule of work must accommodate having both tanks completed by May 2025 with each tank being offline for NO MORE THAN 90 days. It will be up to the contractor to determine if both tanks will need to be done concurrently or overlapped. Contractor shall provide mobilization, demobilization, cleanup, and all labor, materials, tools, equipment, and incidentals required to do the following work on each tank The Water Works Board of the City of Birmingham is soliciting these two tank projects to be performed by one contractor in a tight timeframe before Summer 2025. Total quoted cost of both bids together will be used to determine contract award. Schedule of work must accommodate having both tanks completed by May 2025 with each tank being offline for NO MORE THAN 90 days. It will be up to the contractor to determine if both tanks will need to be done concurrently or overlapped. Contractor shall provide mobilization, demobilization, cleanup, and all labor, materials, tools, equipment, and incidentals required to do the following work on each tank All cleaning, silt removal inside tanks, surface preparation, painting, repairs including installing shell manholes, sampling system, sump pit inside, mixing system, roof finial vents screens, any repairs requiring welding, removal and replacement of foundation grout and caulk, cable climb system inside, refinishing of concrete surfaces, protection of all finished paint surfaces of the tank, and all other miscellaneous associated items as necessary to complete the Work. It will be the Contractor’s responsibility to maintain the roadway and access to the project once started. This work includes all structural, sanitary, safety, and repair items as instructed in Appendix A of the Project Specifications. Each Bid shall be accompanied by a cashier’s check drawn on an Alabama Bank, or Bid Bond, in the amount of five percent (5%) of the bid, not to exceed $10,000.00 in the form and subject to conditions provided for in the Specifications The Successful Bidder will be required to furnish a Performance Bond and a Labor & Material Payment Bond, each in an amount equal to one hundred percent (100%) of the Contract Award. If a Contract is to be awarded, it will be awarded to the lowest responsive and responsible Bidder, who has neither been disqualified nor rejected pursuant to the Contract Documents, and whose Bid, based on an evaluation by the OWNER, indicates that the award will be in the best interest of the project and will result in the lowest overall cost to the OWNER for completion of the project. The OWNER reserves the right to reject any or all proposals, the right to waive irregularities, and the right to accept any proposal deemed to be in the best interest of the OWNER. If a Contract is to be awarded, it will be awarded within 60 calendar days after the day of opening bids.

Award

Water / Sewer

$1,147,850.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
37
Bidding Soon
554
All Active Projects
281
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2024

January 20, 2025

img_map_placeholder

301 10th St, Warrior, AL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Painting and Repairs to Cahaba Cove Potable Water Tank

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.