BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 5, 2024 at 7:00 PM

Updated April 11, 2024

Site work for a bridge / tunnel in Churchbridge, Saskatchewan. Completed plans call for site work for a bridge / tunnel.

SUPPLY AND INSTALLATION OF ONE 900 mm SMOOTH WALL STEEL PIPE CULVERT AND ONE 1 500 mm SMOOTH WALL STEEL PIPE CULVERT by open cut of the embankment on Highway No. 80 in the Town of Churchbridge; for a total length of 46 m. Estimated Quantities: Supply And Install Culverts Group III: 46 m Grouting Between The Soil And Structure: 90 m2 Completion Date: September 27, 2024

Post-Bid

Bridges / Tunnels

$400,000.00

Public - State/Provincial

Site Work

9

5

5

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
0
Bidding Soon
25
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2024

April 5, 2024

Project location map

SK-80, Churchbridge, SK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.