BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 23, 2024 at 8:00 PM

Updated June 25, 2024

Site work and paving for a mixed-use development in Irvine, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Culver/Alton Intersection Improvements, CIP 311905. The work to be performed shall include, but not be limited to: cold milling, roadway excavation and paving; removal and replacement of asphalt pavement, concrete curb, gutter, curb ramps, driveways and sidewalk; water quality structures; retaining wall; utility protection, relocation, cooperation and coordination; pavement delineation and signing; traffic signal modification; landscape and irrigation construction and adjustment of IRWD and other utility facilities; adjusting valve covers and manhole covers to grade, and other items not mentioned here, but are required by the plans and the Special Provisions. Reference attached Specifications and Plans Liquidated Damages $5,200 per calendar day excluding plant establishment, $950 per calendar day including plant establishment Online Q&A Yes Q&A Deadline 03/12/2024 4:00 PM (PST) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% License Requirements A Project Duration 100 Working Days (excluding plant establishment), 190 Working Days (including plant establishment) Start/Delivery Date Est. May 2024

Bid Results

Roads / Highways

$3,881,426.00

Public - City

Paving, Site Work

39

11

8

5

Subscribe For Documents

82 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
604
Active Projects
223
Bidding Soon
4,039
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2024

May 20, 2024

Project location map

Alton Pkwy & Culver Dr, Irvine, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.