BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Lockport, Illinois. Working plans call for site work for a water / sewer project.

Lockport Lock & Dam is located on the I&M canal and is operated by the US Army Corps of Engineers (USACE), Chicago District. The facility is a unit of the Inland Waterway Navigation System and consists of a navigational lock. The address to the facility is 2502 Chanel Drive Lockport, IL 60441 (on the east side of the canal). The site can only be reached by turning west on E Division St & S State St. Follow Division St. and keep right at the fork. Go through the gate with Dead End and Restricted Access signs and follow the road along the canal until reaching the Lockport Lock parking lot. This service Contract requires the Contractor to provide all labor, materials, equipment, and permits to seal, waterproof, and coat the interior concrete walls of four (4) liftgate machinery pits at the Lockport Lock & Dam facility. The machinery pits are used to house cables, pulleys, hydraulic equipment to operate the lock's vertical lift gates. The pits are approximately 20x20 ft, with a depth of 48 ft below surface grade. The concrete wall thickness is at least 3 (three) ft depending on location. There are numerous, small cracks on the surface of the concrete walls supporting the interior of the machinery pits. The cracks are not indicative of shear and/or tension failures, but are more likely due the constant fluctuation of the hydrostatic pressures along the walls adjacent to the lock chamber. When the chamber is filled (at max pool), lock staff identified chamber water seeping through the imperfections of the concrete and into the machinery pits. Due to the nature of equipment, there is grease and hydraulic fluid on the interior surfaces of the buildings. The surfaces must be fully cleaned and degreased prior to application of any sealants, fillers, or adhesives to not compromise adhesion. Portions of walls are obstructed by structural steel which shall be left undisturbed, however the conduit can be dismounted and moved as necessary to complete this Work. The Contractor shall mount the conduit back to its original location post-Work. The period of performance for this contract is 120 days following receipt of Notification to Proceed (NTP). The Method of Contractor Selection has not been determined at this Time

Final Planning

Water / Sewer

$250,000.00

Public - Federal

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
119
Bidding Soon
1,762
All Active Projects
809
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2024

img_map_placeholder

2502 Channel Dr, Lockport, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.