BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Minneapolis, Minnesota. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

65th Ave Storm Sewer Rehabilitation. A Proposal Bond in the amount of not less than 5 percent of the total amount bid, drawn in favor of City of Brooklyn Center shall accompany each bid. Question Deadline 03/07/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing to the Issuing Office. Contact information and submittal procedures for such questions are as follows: 7533 Sunwood Drive NW, Suite 206, Ramsey, MN 55303, (763) 433-2851, fax (763)427-0833 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered. Completion of Work: All Work Under the Contract Must Be Complete by 7/15/2024. Plan Holders List, Addendums and Bid Tabulation: the Plan Holders List, Addendums and Bid Tabulations Will Be Available for Download on-line at the Owner Reserves the Right to Reject Any or All Bids and to Waive Any Irregularities and Informalities Therein and to Award the Contract to Other Than the Lowest Bidder if, in Their Discretion, the Interest of the Owner Would Be Best Served Thereby. The work includes the construction of approximately: 1360 LIN FT STORM SEWER CLEANING AND TELEVISING 60 LIN FT BITUMINOUS CURB 650 LIN FT 54" CIPP LINING 350 SQ FT 6" CONCRETE WALK 710 LIN FT 60" CIPP LINING 230 SQ FT 8" CONCRETE DRIVEWAY 3 EACH MANHOLE CONE SECTION - (96-4020) 150 SQ YD BITUMINOUS STREET PATCH 1 EACH MANHOLE TOP SLAB - (84-4020) 500 LIN FT SEDIMENT CONTROL LOG TYPE WOOD FIBER This section covers special features of this project which may require individual attention of the Contractor and/or the subcontractors. Descriptions contained herein are intended as a service and to prevent oversights by the Contractor. However, the Contractor shall remain the only party liable for the performance of all provisions included in the Contract Documents. B. The owner intends to contract with others for performance of other concurrent work at or adjacent to the project site. The Orchard Lane East Improvements Project, which includes 65 th Avenue, is planned to begin in May 2024. Reconstruction of the project area will not occur until after final completion, but it is anticipated 65 th Avenue will be used as a haul road for the duration of construction. The contractor will coordinate with all project stakeholders. C. Centerpoint Energy intends to construct modifications to their facilities during construction. The contractor will coordinate with all project stakeholders. See APPENDIX for Centerpoint Energy plans.

Bid Results

Water / Sewer

$897,209.00

Public - City

Paving, Site Work

5

14

6

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
83
Bidding Soon
795
All Active Projects
319
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

April 15, 2024

img_map_placeholder

65th Ave N, Minneapolis, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.