Site work and paving for a civil project in Oklahoma City, Oklahoma. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

South Post Road from SE 74th Street to SE 59th; Street SE 74th Street from Douglas Boulevard to Post Road Contract duration: One Time Purchase Contract renewal: Not Applicable Estimated Amount: $24,667,000.00 To bid on this Contract, the Bidder must be prequalified by the City of Oklahoma City's Prequalification Review Board on the Bid Date and Bid Time as: " Paving Contractor A " Notwithstanding the bidding requirement above, the contractor or subcontractor performing any work on Oklahoma City water pipeline must be prequalified as Water Pipeline Contractor "A'' Steel. In addition, any work for which a prequalification classification has been established must be performed by persons or entities prequalified in those classifications. The prequalification classifications, and detailed instruction are available electronically. The prequalification application deadline for the project is 12:00pm, on the 27th day of February, 2024. Question Deadline 03/21/2024 at 12:00 PM CT. All potential bidders are responsible to read all Bidding Documents and submit questions in writing through electronically. Answers, if any, will be published in an addendum. Bidder must complete the Project in accordance with the Bidding Documents, Addenda, and Oklahoma City Standard Specifications for Construction of Public Improvements within 400 calendar days of date as stated in the Work Order. The Maintenance Bond shall be in favor of Awarding Public Agency for a period of Two (2) years in an amount equal to one hundred percent (100%) of the Contract amount. Additional information is contained in the Bidding Documents. Prior to bidding this Project, Bidders must carefully examine the Bidding Documents, Addenda (if any) and the City of Oklahoma City Standard Specifications for Construction of Public Improvements. These Standard Specifications are incorporated by reference into the Bidding Documents except as expressly superseded by the Bidding Documents. Bidder is responsible for monitoring the electronically to determine whether addenda were issued and for opening and complying with all addenda. The work in the Plans and Specifications must be substantially complete no later than August 31, 2025. The work in the Plans and Specifications has a final completion date of September 30, 2025. Each Bid shall be accompanied by a Bid Security in the form of a Bid Bond and/or irrevocable letter of credit or a certified check and/or cashier's check delivered by bid receipt time, in the amount of five percent (5%) of the amount of the Bid. Bid Bonds must be uploaded in the Electronic Bidding Process and must be submitted electronically with the Bid. STATUTORY BOND such sum being equal to 100% of the Contract price, for the payment of sum amount, we, and each of us, bind ourselves, our heirs, executors and assigns, themselves, and its successors and assigns, jointly and severally, firmly to the terms of this Bond by these presents. MAINTENANCE BOND such sum being equal to 100% of the Contract price, for the payment of sum amount, we, and each of us, bind ourselves, our heirs, executors and assigns, themselves, and its successors and assigns, jointly and severally, firmly to the terms of this Bond by these presents. The Bids will be considered by the Awarding Public Agency. The Awarding Public Agency shall have the right to reject any or all Bids. The Awarding Public Agency shall have the right to waive immaterial defects or irregularities in a Bid received and to accept the Bid, which, in the Awarding Public Agency's judgment, is in its own best interest. Site Visit: Make arrangements for Engineer to visit quarry site to observe materialsproposed for riprap and riprap bedding.

Award

Roads / Highways

$22,690,069.00

Public - City

Paving, Site Work

239

34

91

7

Subscribe For Documents

75 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
54
Bidding Soon
678
All Active Projects
310
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 10, 2024

June 10, 2024

October 14, 2025

img_map_placeholder

Multiple Locations, Oklahoma City, OK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.