Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 21, 2024 at 7:00 PM

Updated March 2, 2024

Renovation of an educational facility in Lexington, Kentucky. Completed plans call for the renovation of a educational facility.

This program presents in summary, the requirements for the preparation of design and construction documents and estimates for the replacement of two boilers within the Central Heating Plant #2 at the University of Kentucky. The program is prepared as a basis for understanding and agreement within the university and as a definitive statement to the Consultant engaged in the design of the project. The Central Heating Plant #2 currently houses two natural gas/fuel oil boilers and two coal boilers along with auxiliary equipment. This project will consist of the removal of the two coal boilers and the installation of one new natural gas/fuel oil fired boiler (100kpph+) along with other necessary plant equipment. Design of new gas boiler installation should include leaving space for a future boiler of similar capacity. The existing natural gas boilers will be expected to remain in service for the duration of the project, with exception for minimal outages as needed. Project may consist of but is not limited to: 1. Removal of two coal boilers and necessary coal boiler equipment such as coal handling equipment, boiler fans, etc. 2. Infill pits below the coal boilers. 3. Installation of new natural gas boiler with fuel oil backup. This will require an exterior wall to be removed during construction and then replaced with consideration for future boiler installation. 4. Replacement of the two existing DA tanks on the coal side of the plant with a single new DA that can support a +/-300,000 lb/hr plant steam load. 5. Replacement of the existing water softener system with a new system that can supply 600 gpm of soft water continuously to all boilers. TOTAL CONSTRUCTION BUDGET* $14,050,000 TOTAL PROJECT SCOPE $18,750,000

Post-Bid

Educational

$18,750,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
116
Bidding Soon
2,004
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2024

May 12, 2025

Project location map

Multiple Locations, Lexington, KY


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed