Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 17, 2024 at 8:00 PM

Updated March 18, 2024

Demolition, site work, paving and new construction of a civil project in Piney Creek, North Carolina. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

Contract No.: DK00319 WBS: 17BP.11.R.131 County Ashe Location: Bridge NO. 040122 over North Fork New River on SR 1549 (Garvey Bridge Road) Type of Work: Grading, Drainage, Paving, and Structure The date of availability for this project is April 23, 2024. The date of completion for this project is March 23, 2026. Contractors must be pre-qualified with NCDOT as Bidder or PO Prime Contractor prior to bidding on this project. A Bid Bond or Bid Deposit in the Amount of 5% of the Total Amount Bid Will Be Required. The Bidder Shall Submit an Electronic Bid Bond With Each Electronic Bid Submittal Unless He Elects to Furnish a Bid If you have questions about bidding on this project or any other question concerning this project, please contact me at (336) 903-9115 or belmore@ncdot.gov. NCDOT- Replace Bridge No. 040122 - SR 1549 The Combined MBE/WBE Goal for this project is 3 % (A) Minority Business Enterprises 1 % (B) Women Business Enterprises 2 %

Bid Results

Bridges / Tunnels

$2,900,303.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

85

6

9

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
78
Bidding Soon
1,293
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2024

April 23, 2024

Project location map

State Rd 1549, Piney Creek, NC

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed