BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Decatur, Illinois. Working plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Project includes the following two (2) Divisions of Work which will be awarded separately: DIVISION A :The owner has pre-procured a dual service switchboard and ATS that the successful bidder will install. The contractor will supply and install new 1200 AMP CT enclosure. The installation will require the removal and re-installation of two underground duct banks each consisting of 4 (4") conduits. DIVISION B :Work includes the removal of the existing #2 pump and installation of a new pump that the owner has pre-procured together with upgrades to the electrical service at the station. The new pump is a Flygt 385 HP, 455A submersible pump and will require the wet well to be bypassed while new base elbow, guide rails, bracket installation, and pump commissioning occurs. Bidding Documents may be obtained online. Prospective Bidders are urged to register online as a plan holder, even if Bidding Documents are obtained from a plan room or source other than in either electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through online. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than online. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Donald B Miller, P.E. - Director of Engineering, Sanitary District of Decatur IL DonM@SDDCleanwater.org Bidders, This is a reminder to you all that the project does anticipate that temporary electrical will be included during the construction sequence. As such, bidders should include its cost on the bid form item 1.2. If conditions during construction change and it is not required, then a change order will be negoitiated and incorporated as part of the contract documents. Donald B Miller, P.E.. All bids rejected.

Final Planning

Sidewalks / Parking Lot

$250,000.00

Public - City

Paving, Site Work

21

19

6

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
49
Bidding Soon
801
All Active Projects
358
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 18, 2024

May 30, 2024

July 28, 2024

img_map_placeholder

E Damon Ave, Decatur, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.