BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Coeur D Alene, Idaho. Completed plans call for site work for a water / sewer project; and for the renovation of a water / sewer project.

Blackwell Island Lift Station and Lighting Upgrades Project Location: Blackwell Island Recreation Site, Coeur d'Alene, ID. All questions should be emailed directly to the Contracting Officer. Only written RFI's will be considered and responded to by the Government. BLM responses to RFIs will be posted as an amendment to the solicitation. Period of Performance: 03/15/2024 to 07/01/2024. If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $500.00 for each calendar day of delay until the work is completed or accepted. If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause. Magnitude: Between $100,000 and $250,000 The Work for the Project is defined by the Contract Documents and consists of the following: 1. Design of repairs and/or upgrades recommended by previous investigation and assessment of Blackwell Island Lift Station and controls and selected by BLM 2. Design of light pole and fixture upgrades to the existing power system. B. Type of Contract: 1. Project will be constructed under a single prime contract. 1.4 ACCESS TO SITE A. General: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section. B. Use of Site: Limit use of Project site to Work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated 1. Limits: Limit site disturbance, including earthwork if any clearing of vegetation, utilities, and all other constructed areas. 1.5 COORDINATION WITH GOVERNMENT A. Full Government Occupancy: Perform the Work so as not to interfere with Government's dayto-day operations unless approved by Government. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$140,403.00

Public - Federal

Renovation, Site Work

14

22

2

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
3
Bidding Soon
106
All Active Projects
33
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2024

March 15, 2024

img_map_placeholder

945 US-95, Coeur D Alene, ID

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.