BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Salina, Oklahoma. Completed plans call for site work for a water / sewer project.

A general summary of the work to be performed by Contractor for the Units 5 and 6 Refurbishment at the Salina PSP, includes, but it is not limited to the following: 1. Supply of replacement runners and ancillary equipment; 2. Supply of replacement wicket gates and ancillary equipment; 3. Possible modification of stay vanes to improve efficiency and operation; 4. Participation in workshop / studies to discuss performance characteristics/goals that would best position Salina pump-generating units for participation, marketability, and flexibility in the SPP; 5. Completion of CFD analysis and Model Testing Study of Contractors hydraulic design, including evaluation of both fixed and adjustable speed operation; 6. Refurbishment of wicket gate operating mechanism; 7. Replacement of operating mechanism seals and bushings; 8. Refurbishment and modernization of governor system with new digital governor controller; 9. Refurbishment of pump-turbine inlet valves (butterfly type); 10. Replacement of unit controls; 11. Unit disassembly, rehabilitation, and reassembly; 12. Modification or replacement of other pump-generator components as required by Contractors approved design. 13. Perform signature tests prior to pump-generator refurbishment and testing after pump-generator refurbishment. 14. Perform start-up and commissioning of the refurbished pump-generators. 15. Replace worn and wear parts. Question Deadline 04/12/2024 at 5:00 PM CT The Owner reserves the unqualified right to reject any and all bids on any grounds which the Owner, in its sole discretion, deems appropriate. Each bid must be accompanied by a Bid Bond issued by a surety company acceptable to Owner and listed in Federal Circular 570. in an amount equal to five percent (5%) of the sum of the Contract Price. The successful Bidder will be required to execute the Contract and to furnish a performance bond and a payment bond in an amount equal to 100% of the Contract Price as security for the faithful performance and payment of Contractors obligations under the Contract.

Bid Results

Water / Sewer

$50,000.00

Public - State/Provincial

Site Work

382

21

10

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
61
Bidding Soon
821
All Active Projects
359
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 26, 2024

July 29, 2024

img_map_placeholder

620 S 4437 Rd, Salina, OK

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.