BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Bessemer, Alabama. Contact the soliciting agency for additional information.

Commercial HVAC Duct Cleaning Services Duct System Cleaning 1. Vendors shall clean all components of the air conveyance system includes all interior surfaces of the facility's air distribution system that service conditioned spaces and/occupied zones. This includes the entire heating, air-conditioning and ventilation system from the points where air enters the system, to the final point of discharge prior to entering the conditioned environment. The return air grilles, return air ducts to the AHU, the interior surfaces of the AHU, mixing boxes, coil compartment, condensate drain pans, supply air ducts, fans, fan housings, fan blades, turning vanes, filters, filter housings, reheat coils, cooling coils, flexible ductwork and supply diffusers are all considered part of the HVAC system. To properly remove lint, hair, fungi, dirt and other foreign materials and residues from the HVAC system. 2. The cleaning procedures shall be accompanied using specialized equipment, (i.e., high efficiency vacuum system utilizing HEPA filters, high pressure washers,duct brushes, etc.), as required. Special attention shall be taken while cleaning to prevent high levels microbial contaminants from becoming airborne and disseminated into occupied areas. All effluent shall be removed and disposed of by Vendor. HEPA filtration with 99.97% collection efficiency for 0.3-micron size (or greater) particles shall be used. When the collection equipment is exhausting outside the building, mechanical cleaning operations shall be undertaken only with particulate collection equipment in place, including adequate filtration to contain debris removed from the HVAC system. When the particulate collection equipment is exhausting outside the building, precautions shall be taken to locate the equipment down wind and away from all air intakes and other points of entry into the building. All interior equipment, furniture, files andmaterial shall be adequately covered and protected as necessary to prevent damage. Any damaged fixtures, equipment or systems shall be repaired, if possible, or replaced with equal equipment at no cost to BCS. Deadlines for Inquiries May 14, 2024 BCS reserves the right to reject any or all proposals in whole or in part and is not necessarily bound to accept the lowest price, but instead will accept and award to the proposal that is most responsible and best suits BCS. BCS reserves the right to waive minor irregularities. A proposal may be rejected if it is in any way incomplete or irregular, and preference will be given to local vendors.

Post-Bid

Educational

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
36
Bidding Soon
590
All Active Projects
234
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.