BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 2, 2024 at 8:00 PM

Updated April 3, 2024

Site work and paving for a mixed-use development in Sun Prairie, Wisconsin. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

** As of April 2 2024, project was awarded to S & L Underground, Inc, with the bid amount of $2,251,737.91.** Site Address: Vandenburg Street & Aspen Place City: Sun Prairie County: Wisconsin State/Province: WI Site Directions: N Bird Street to Vandenburg Street Est. Value: $ 2,500,000.00 Est. Completion Date: Sept. 30, 2024 Reconstruct Vandenburg Street and Aspen Place. This includes removal and replacement of c&g, CABC, asphalt pavement, sidewalks, water main and services, some storm sewer replacements/extensions. N Bird Street storm sewer extension will consist of extending two culverts to accommodate future asphalt multi-use path. Plans and specifications will be available on-line for a $42.00 fee beginning Friday, February 16, 2024. The work under this contract shall consist of grading, base aggregate dense, HMA pavement, storm sewer, sanitary sewer manhole casting adjustments, water main and water lateral replacements, valve box adjustments, concrete curb and gutter, concrete sidewalk, pavement marking and landscaping, multi-use path and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. The intent of this work is to document the condition of existing or newly constructed sanitary sewer mains and laterals, post underground utility construction, as identified by the City of Sun Prairie Wastewater Treatment Plant (City). This work will be accomplished by utilizing closed circuit television (CCTV) equipment. Television reports must be compatible with WinCan software.

Award

Roads / Highways

$2,251,738.00

Public - City

Paving, Site Work

31

8

2

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2024

April 29, 2024

Project location map

Aspen Pl & Vandenburg St, Sun Prairie, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.