BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a municipal facility in Miami, Florida. Completed plans call for the renovation of a municipal facility.

Scope of Work: (Contractor must obtain and submit all permits prior to performing any work.) Prospective bidder shall carefully examine the site of the work & be satisfied as to all observable conditions. Bidder shall be responsible for measuring and calculating amount of work. Scope of work consists of, but is not limited to, furnishing all supervision, labor, materials, services, overhead & profit, permits, equipment, tools, etc. and testing necessary to perform the Renovations of SPCC Lounges and Restrooms floors 3-29. The Stephen P. Clark Government Center ADA Barrier Removal: Office Tower Public Access / Employee Areas - including Conference Rooms, Employee Lounges, Offices, Public Restrooms and a New Family Restroom on the 18th floor (Excludes the 18th Floor Conference Rooms/Public Areas and Coffee Shop). All work is to be done as per the approved permit set of plans. The Contractor shall provide all the necessary material procurement, management, labor, materials, tools, equipment, supplies, services, components, and disposal to comply with the contract's General Conditions to successfully complete the renovation of the existing public restrooms as per the approved permit set of plans. The Contractor assumes all the responsibility for site verification of equipment for replacement, controls and other items required to successfully complete the renovation and meet the necessary building and safety codes. The Contractor shall become familiar with details of work in the field and shall advise OWNER of any discrepancy prior to performing any tasks, including but not limited to existing and proposed quantities, building and area locations, etc. The Contractor shall thoroughly investigate and satisfy itself of the conditions affecting the work prior to construction start. Contractor will complete 1-floor mockup of the restrooms and lounges for management approval prior to beginning the remaining restrooms and lounges. The time that it will take for restrooms and lounges is part of the total construction duration. This will allow ISD to approve the mock-up as part of the contractor's quality of work. Contractor is responsible for providing submittals any substitutions within 30-days of Contract Award. The contractor is responsible to secure and store all specified building materials such as, but not limited to tiles, fixtures, and accessories...all part of the bid price. Approved finishes must remain uniformly throughout the project. All noise-producing and disruptive work shall be performed in the evening after hours or on weekends with non-disruptive work allowed within the hours of 7:00 am to 6:00 pm, Monday through Friday. SPCC is an essential government building and shall maintain upmost security parameters and clearance during operations. Approved plans process number with Miami Dade County {Building Dept. / Process #C2022003505. Bid price is to include the removal and proper disposal of all work-related debris. Bid price is also to include all related permit fees and permitting expenses related therewith. Security: Workers for Contractor and subcontractors must clear a background check with the Police Department prior to beginning work. All workers are required to wear a shirt/uniform that identifies the company of the Contractor or his subcontractors. The estimated construction cost is $4,315,392.05. This estimate includes $125,691.03 estimated permit fees. The Bid shall consist of the Base Bid amount (Lump Sum) inclusive of all permit fees and excluding Contingency. NOTE: There is a Dedicated Allowances on this Project $41,897.01 for survey & testing. There is a 10% Contingency on this Project. Note: a. THE COUNTY REQUIRES, after Bid Opening and within three (3) business days of County's written request, Bidder's references for projects that are representative of similar scope, of equal or greater value, and that demonstrate a MINIMUM REQUIRED of: five (5) years EXPERIENCE and five (5) similar COMPLETED PROJECTS. In accordance with Resolution R-1122-21, the experience of the Bidder's key personnel will be considered in assessing whether the Bidder complies with this solicitation's minimum experience or completed project requirement. References must include the following information: 1) a description of scope of work performed; 2) project address; 3) name and title of Bidder's key personnel assigned to that project; and, 4) client contact information: name, address, phone number, email address, project cost, and project start and completion dates. The Prime Contractor shall be required to provide a list of Example Projects that demonstrate each Firm's key individuals' ability and experience to successfully plan and complete the project. The project is located at SPCC Building, 111 NW 1st Street, Miami, FL 33128. Online Bid Opening - Members of the public are not required to enter their name to join the meeting if they do not wish to do so. Members may identify themselves as Public Attendee. Members of the public will be granted view-only access to the meeting, but will not have video or speaking capabilities. FIMD Administration is inviting you to a scheduled Zoom meeting All requests for information (RFIs) shall comply with the Cone of Silence, Administrative Order 3- 27 and shall be emailed to kristina.hagberg@miamidade.gov with a copy to marlene.blanco@miamidade.gov and clerkbcc@miamidade.gov. The deadline to receive RFIs from bidders is no later than 2 PM on Friday, March 1, 2024. Responses cannot be guaranteed for RFIs submitted past the established deadline. Procedural questions may be entertained by phone or during the Pre-Bid Meeting. Design Drawing Included: YES Shop Drawing Included: NO Specifications Included: YES Anticipated Start Date: 5/14/2024 Calendar Days for Project Completion: 547

Post-Bid

Municipal

$4,315,392.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
51
Bidding Soon
1,107
All Active Projects
455
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2024

May 28, 2024

img_map_placeholder

111 NW 1st St, Miami, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.