BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 29, 2024 at 8:00 PM

Updated April 30, 2024

Site work for a road / highway in Montezuma Creek, Utah. Completed plans call for site work for a road / highway.

County: san juan This project requires using the electronic certified payroll program. See attachment to notice to contractors. This is a working p+t (price + time) project. Electronic mbdc files/models provided on project explorer. The department will not hold retention on this project. Per utah state code as 13-8-5 (1) prime contractors cannot hold retention. Refer to utah code as 13-8-5 (1) for more information. wage rates: apply Engineer's estimate: Greater than $80m but less than or equal $100m Mandatory prequalification required (qualified health insurance required) Each bidder must submit an electronic bid bond from an approved surety company using udot's bidding Businesssystem or in lieu thereof, cash, certified check, or cashier's check for not less than 5% of the total amount Of the bid, made payable to the utah department of transportation, showing evidence of good faith and a guarantee That if awarded the contract, the bidder will execute the contract and furnish the contract bonds as required. The right to reject any or all bids is reserved. UTDOT - SR-162 and SR-262 Safety and Energy Corridor *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Roads / Highways

$100,000,000.00

Public - State/Provincial

Site Work

879

11

10

7

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
9
Bidding Soon
104
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2024

June 3, 2024

Project location map

UT-262 & UT-162, Montezuma Creek, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.