Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 26, 2024 at 8:00 PM

Updated April 27, 2024

Site work for a water / sewer project in Rocklin, California. Completed plans call for site work for a water / sewer project.

**As of April 26,2024, project was awarded to Root Control, Inc, awarded amount is $62,947.58.** The project scope of work includes the following: Apply Chemical Root Treatment to 133 Mainline Pipe Segments. Diameters ranging from 4-inch to 18-inch and accumulative length totaling 33,659 feet. The Contractor shall furnish all labor, equipment, materials, plant, and supervision to perform the work. SPMUD will perform pre-treatment root cutting at least 6 weeks prior to application of the product. Contractor shall provide traffic control measures, as required by encroachment permit issued by the governing agency. The District has programmed $60,000 for this project. Award: The award shall be made to the lowest responsible bidder whose proposal complies with the specified requirements. The Contractor shall execute the Contract within ten (10) business days after he has received the Contract from the District. The District reserves the right to: (1) waive any irregularity in the bids, (2) reject any and all bids, and (3) make all awards in the best interest of the District.

Award

Water / Sewer

$62,948.00

Public - County

Site Work

5

7

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
406
Active Projects
156
Bidding Soon
2,528
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2024

April 15, 2024

Project location map

Multiple Locations, Rocklin, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed