BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Baraboo, Wisconsin. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

The Project includes the following Work: Construction of approximately 550 linear feet of a new rural roadway consisting of all grubbing, roadway grading, salvaged base aggregate, base aggregate dense 1 1/4 - inch, 18-inch CMP culverts, 24-inch CMP culverts, riprap, erosion control, traffic control, double chip seal, restoration including salvaged topsoil, seeding, fertilizer and erosion mat. No Proposal Will Be Accepted Unless Accompanied by a Certified Check or Bid Bond Equal to at Least 5% of the Amount Bid, Payable to the Town as a Guarantee That, if the Bid is Accepted, the Bidder Will Execute and File the Proper Contract and Bond Within 15 Days After the Award of the Contract. The Certified Check or Bid Bond Will Be Returned to the Bidder as Soon as the Contract is Signed, and if After 15 Days the Bidder Shall Fail to Do So, the Certified Check or Bid Bond Shall Be Forfeited to the Town as Liquidated Damages. No Bidder May Withdraw Their Bid Within 60 Days After the Actual Date of the Opening Thereof. The Minimum Wages to Be Paid on the Project Shall Be in Accordance With the Wage Rate Scale Established by Local Wage Rates. Town reserves the right to waive any informalities or to reject any or all bids. All questions about the meaning or intent of the Bidding Documents are to be submitted to TOWN in writing. Interpretations or clarifications considered necessary by the TOWN in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by TOWN as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect The Project has an expected duration of 40 calendar days from start of construction. The Substantial Completion date is 35 calendar days from the start of construction, and the Final Completion date is 5 calendar days from the Substation Completion date.

Bid Results

Bridges / Tunnels

$129,016.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
28
Bidding Soon
533
All Active Projects
235
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

April 1, 2024

img_map_placeholder

Sleepy Hollow Private Drive, Baraboo, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.