BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in San Bernardino, California. Completed plans call for site work for a water / sewer project.

**As of June 18, 2024, this project has not yet been awarded. A timeline for award has not yet been established.** **As of June 6, 2024, this project has not yet been awarded. A timeline for award has not yet been established.** Furnish all labor, equipment, and tools to remove 7,504 outdated analog water meters, replacing them with 7,504 advanced meters integrated with Itron 500W cellular ERT communication modules. Furthermore, within the scope of the AMI phase 1 project, 5,042 advanced meters are currently fitted with Itron 100W endpoints. These meters necessitate the replacement of all 100W endpoints with Itron 500W endpoints. In addition to this, the project entails supplying the labor, tools, and materials to eliminate 398 existing water meter boxes. Then 398 H20 Traffic Rated meter boxes will be installed, accompanied by constructing a concrete pad measuring 4 inches in thickness and 12 inches in diameter around each meter box. This construction process adheres to the SBMWD Standard W1.1 (Attachment), ultimately reaching the final grade. Minimum Experience Requirements: Each Bidder shall show that he/she has completed the installation of three (3) AMI Projects of similar size and complexity within the last five (5) years for a similar size and type of agency. Project experiences with a water utility or other governmental agency are preferred. Other Details Minority and disadvantaged businesses are strongly encouraged to submit bids for this project as a prime contractor. Minority and disadvantaged businesses are also encouraged to reach out to prime contractors to partner up as subcontractors on portions of the project that they are able to perform. All contractors must follow the Special provisions Section of the Technical Specifications and comply with all applicable general law, regulations, executive orders, FEMA policies, procedures, and directives. Contractors are required to submit with their bids the Federal Forms contained in Appendix AA. Notes The bidder is solely responsible for on time submission of their electronic bid. The Department will only consider bids that have been transmitted successfully and have been issued an ebid confirmation number with a time stamp form the Bid Management System indicating that bid was submitted successfully. Transmission of bids by any other means will not be accepted. Bidder shall be solely responsible for informing itself with respect to the proper utilization of the bid management system, for ensuring the capability of their computer system to upload the required documents, and for the stability of their internet service. Failure of the bidder to successfully submit an electronic bid shall be at the bidder's sole risk and no relief will be given for late and/or improperly submitted bids. Bidders experiencing any technical difficulties with the bid submission process may contact PlanetBids at (818) 992-1771. Questions of an operational nature may be directed to the Department's Contracts' Office at (909) 384-5393. Neither the Department, nor PlanetBids, makes any guarantee as to the timely availability of assistance, or assurance that any given problem will be resolved by the bid submission deadline. This project is also subject to compliance monitoring and enforcement by the Department of Industrial Relations. The City of San Bernardino Municipal Water Department will not accept a bid nor will it contract or subcontract without proof of the contractor or subcontractor's current registration to perform public works pursuant to section 1725.5. Special Notices Local Programs & Policies The project is funded through Bureau of Reclamation Grant and the Department of Water Resources Grant. The awarded contractor will comply with all applicable federal law, regulations, executive orders, FEMA policies, procedures, and directives and any other applicable policies, procedures, and regulations directly related to such grants. This project is also subject to compliance monitoring and enforcement by the Department of Industrial Relations. The City of San Bernardino Municipal Water Department will not accept a bid nor will it contract or subcontract without proof of the contractor or subcontractor's current registration to perform public works pursuant to section 1725.5. Please include proof of DIR registration for contractor and subcontractor's along with your general attachments. Online Q&A Yes Q&A Deadline 03/15/2024 4:00 PM (PST) If you have any questions about the type of coverage we require, you may e-mail your questions to: Sydney Morrison Contracts Administrator City of San Bernardino Municipal Water Department 909-384-5393 E-mail address: Sydney.morrison@sbmwd.org Installation Process: a. Turn off the water supply using . b. Remove the existing meter. c. Prepare the pipeline for meter installation. d. Insert black PVC hardware net at the surface grade within the meter box. e. Install the meter, ensuring the flow direction matches the arrow on the meter. f. Connect the meter to the pipeline using the appropriate fittings. g. Connect the 500w endpoint to the meter connection and install it to the mounting hardware. h. Install a meter box over the meter, ensuring its level and security. i. Open the front hose spigot, slowly open the curb stop, and flush the private side waterline to remove any debris that may have entered the private side waterline. j. Restoring the water supply by fully opening the curb stop and checking for leaks. Scope of Work: Meter Replacements (non-Itron compatible): o 1/2" meter upgrades to 5/8" meters: 787 units o 5/8" meters: 5,593 units o 3/4" meters: 370 units o 1" meters: 286 units o 1 1/2" meters: 128 units o 2" meters: 67 units o 3" meters: 9 units o 4" meters: 8 units o 4" fire service trim meter 5/8" installation: 43 units o 6" meters: 1 unit o 6" fire service trim meter 5/8" installation: 30 units o 8" fire service trim meter 5/8" installation: 14 units o 10" fire service trim meter 5/8" installation: 4 units Water Meter Replacement - Detailed Scope of Work 1. Site Inspection: a. Confirm the installation site (address/location I.D./meter serial number). b. Identify any potential obstacles or hazards. c. Determine the accessibility of equipment and tools. 2. Materials and Equipment: a. Water meter (of the specified model and size). b. AMI Equipment (500w cellular endpoint). c. Meter box (if necessary). d. Meter box lid requirements are noted below.

Bid Results

Water / Sewer

$850,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

15

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
98
Bidding Soon
2,192
All Active Projects
986
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2024

May 31, 2024

img_map_placeholder

Multiple Locations, San Bernardino, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.