BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in East Wenatchee, Washington. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The CITY OF EAST WENATCHEE solicits proposals from consulting firms with expertise in civil engineering and design. Consultants will be considered for the following project. The work to be performed by the Consultant consists of preparing preliminary engineering plans, specifications, and estimates (PS&E) for the construction of street improvements on North Kentucky Ave. This project is pided into two phases. Phase 1 is from Grant Road to 5th Street NE. Phase 2 is from 5th Street NE to 10th Street NE. The major features of the project are as follows: * Phase 1 consists of approximately 2660 feet of improvements including roadway reconstruction, curb, gutter, sidewalk, illumination, and enhanced pedestrian facilities. The intersections of 3rd Street NE and 5th Street NE will be evaluated for possible safety enhancements. The Douglas County Sewer District is expected to have utility upgrades in this phase that may align with this project. Phase 1 shall reach 90% PS&E. * Phase 2 consists of approximately 3200 feet of improvements, along with the intersection of 8th Street NE being evaluated for possible safety enhancements. This phase shall reach 30% PS&E. Required stormwater retention and treatment locations shall be identified as a part of this effort. If stormwater mitigation is best achieved within phase 1's project area, the phase 1 stormwater facilities should be sized to meet future treatment and retention requirements. * Right of Way needs may be identified within Phase 1's project area. Right of Way Acquisition may be supplemented to the initial agreement as needed. * Complete stormwater collection, treatment, and conveyance system in accordance with current NPDES requirements. * Americans with Disabilities Act (ADA) compliance. * Environmental planning, permit applications, and NEPA approval. * The City has received design and right of way funding through the Public Works Board. Questions regarding this project should be directed to: Garren Melton, Public Works Manager at gmelton@eastwenatcheewa.gov. The City of East Wenatchee is an equal opportunity and affirmative action employer. Minority- and women-owned firms and Section 3 business concerns are encouraged to submit a proposal. Persons with disabilities may request this information be prepared and supplied in alternate forms by calling the City Clerk at 509-884-9515.

Conceptual

Roads / Highways

$4,000,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
2
Bidding Soon
93
All Active Projects
28
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2025

img_map_placeholder

N Kentucky Ave, East Wenatchee, WA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.