BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to an educational facility in Omaha, Nebraska. Completed plans call for site work for a 145,921-square-foot, two-story above grade educational facility.

A. The Work includes but is not limited to the following systems, equipment and services: 1. Fire suppression system consisting of all items indicated by the Drawings and/or specified herein, such as: a. Automatic sprinkler systems (wet pipe systems, dry pipe systems, preaction systems, etc.). b. Sprinkler systems zoned as specified and indicated on the drawings. c. Custom finishes for concealed sprinkler head covers. d. Alarm tamper and flow switches. 2. Division 21 Subcontractor shall install and coordinate devices such as alarm contacts, temperature sensor locations, etc., with the BMCS contractor. See the requirements of Divisions 21, 22 and 23 for coordination and installation requirements. 3. Furnish and install all miscellaneous supports for Division 21 Work and equipment. 4. Furnishing of Coordination Drawings as specified herein. 5. Furnishing of Project Record Documents as specified herein. 6. Furnishing of Shop Drawings, Product Data and Samples. 7. Furnishing of Test Procedures, Test Reports, and Certifications as specified and required for all Division 21 Work. 8. Balancing and adjusting of fire suppression systems as specified herein. 9. Performance and acceptance testing of equipment and systems as specified herein and as required by authorities having jurisdiction. Participate in and provide labor as required for "off hour" testing of equipment and systems if required by job conditions or by the authorities having jurisdiction and as required to obtain the "Temporary Certificates of Occupancy (TCO)". 10. Furnishing of operating and maintenance books. The project includes demolition work, miscellaneous finishes up grades & improvements and related mechanical/electrical work. The bids go to the board of education March 11, 2024, if approved construction will begin after that. The project is tax exempt.

Under Construction

Educational

$10,874,000.00

Public - City

Addition, Demolition, Renovation, Site Work

237

31

10

4

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
35
Bidding Soon
522
All Active Projects
212
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2024

May 27, 2024

img_map_placeholder

1313 S 208th St, Omaha, NE

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.