Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 27, 2024 at 8:00 PM

Updated March 28, 2024

Site work for a mixed-use development in Toledo, Ohio. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.

Scope of Services This project is for the replacement of the existing playground at Joseph P. Burnett Park. Work includes removal of the existing play structure, installation of new concrete edging, installation of new play structure and drainage system as well as site restoration Online Q&A Yes Q&A Deadline 03/20/2024 12:00 PM (EDT) Bid Bond 5.00% Payment Bond 0.00% Performance Bond 100.00%

Bid Results

Playgrounds / Parks / Athletic Fields

$79,397.00

Public - City

Site Work

8

5

2

3

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
425
Active Projects
208
Bidding Soon
2,615
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2024

April 26, 2024

Project location map

1606 Starr Ave, Toledo, OH

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed