BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a multi-residential development in San Antonio, Florida. Completed plans call for the renovation of a multi-residential development.

The Pasco County Housing Authority (PCHA) is requesting quotes for exterior stair work to be completed at one of its apartment properties. The property is located in San Antonio, FL 33756. Interested and qualified contractors who have successfully demonstrated their ability and experience on comparable work are invited to submit a quote. Minority and women-owned businesses are encouraged to respond. Remove the existing stairs, first landing, trim at first landing, hand rails and post at top of stairs. 2. Remove railing on second floor and carpet. Examine landing on second floor once carpeting is removed to ensure it meets safety standards. Two sets of stairs, landings, posts, etc.... 3. Provide and install new pressure treated stairs, first landing area, trim at first landing, hand rails, and top post. * Could potentially use metal in place of pressure treated wood being replaced. 4. Provide and install new wood railing on second floor and new exterior carpet. 5. Remove wood and hand rail that is over sidewalk at front of building. Fill holes with dirt left from removing post. 6. All wood to be sealed and stained Walnut color. 7. Contractor to provide any permit and/or any engineering needed to complete project. The Contractor shall keep the working area sufficiently clear of equipment, material, and implements of service to prevent endangering persons and damage to the PCHA's property and to avoid an unsightly condition. Removal of such items shall be performed promptly upon completion of work. All debris and other waste materials shall be removed from the site and disposed of legally. The Contractor shall not use PCHA's facilities for disposal of debris and waste materials. Roofing nails are to be picked up throughout the day to avoid any safety issues. All quotes shall cover material required to complete work description. Contractor is cautioned to verify all site conditions. It is strongly encouraged that bidders/respondents visit the site. Descriptions are to be bid on and strictly adhered to. All bids shall cover material required to complete work description.

Post-Bid

Multi-Residential

$150,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
66
Bidding Soon
1,327
All Active Projects
505
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2024

April 11, 2024

img_map_placeholder

12023 Joe Herrmann Dr, San Antonio, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.