BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Medical Lake, Washington. Completed plans call for site work for a water / sewer project.

North Cottages and Central Campus Utility Line Replacement ESTIMATED BASE BID COST RANGE: $648,500.00 to $716,500.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. +1 564-999-2000,,994059963# United States, Olympia (833) 322-1218,,994059963# United States (Tollfree) Phone Conference ID: 994 059 963# Find a local number | Reset PIN (See additional information below) Please direct questions regarding this project to the office of the Consultant, Columbia Engineering Group, Nate O'Neel, 17509 N.E. 65 th Court, Vancouver, WA 98686, phone # 509-720-7048, email noneel@cegiusa.com. Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% Washington Small Business, and 5% Veterans have been established for this project. Achievement of the goals is encouraged. A. This project includes various trades. Coordinating of construction activities by the Contractor will be required to ensure that the project will not affect the operation of State personnel throughout the entire construction process. Site access is limited and portions of the building will remain occupied during construction. 1. Each trade is governed by General and Supplemental Conditions of the Contract and all provisions of Division 1, General Requirements, whether or not specifically referenced for its particular work. B. Briefly, and without force and effect upon the Contract Documents, the Work of the Contract can be summarized as follows: The Project consists of replacing a portion of the existing underground domestic water main line. The building will continue to be occupied during construction so the project will include infection control measures and phasing. C. The Work includes but is not limited to the following: 1. Locating existing underground utilities prior to excavating. Excavation work will avoid hitting existing underground utilities. 2. 3. Install temporary domestic water lines to serve the occupied buildings. 4. Demo a select portion of the existing underground domestic water mains 5. Install new domestic water mains, testing, & sanitising. 6. Switchover from temporary water lines to new water lines. 7. Surface restoration (sidewalks, HMA paving, irrigation system, seeding, etc) Work must be done in conformance with specification Section Special Procedures, 01 35 10. Afterhours work may be required for specific portions of the work such as power shut-downs for switchovers.

Award

Water / Sewer

$735,600.00

Public - State/Provincial

Site Work

17

14

4

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
4
Bidding Soon
126
All Active Projects
40
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2024

April 8, 2024

img_map_placeholder

2320 Salnave Rd, Medical Lake, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.