BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Miami Springs, Florida. Completed plans call for site work for a water / sewer project.

**As of March 29, 2024, bids were canceled. No definite date for the rebid.** The City of Miami Springs ("City") is soliciting bids for the Construction of Hook Square Pump House Replacement Project. The ITB contains detailed information about the scope of services, submission requirements, and selection procedures. If Bidders elect to use, it is strongly encouraged to register with the website to receive notifications pertaining to this solicitation. All notices and any addenda issued by the City with respect to the ITB will be made available through portal, and via the City's webpage. It is the Bidder's sole responsibility to ensure receipt of any issued notice or addenda relating to this ITB once posted. Any bid submission received after this time and date, whether by mail or otherwise, will be returned unopened. Bidders are responsible for ensuring that their bid is received and timestamped in the Clerk's Office by the deadline. All Bidders planning to submit a bid must attend both of these meetings. Bidders should allow sufficient time to ensure arrival prior to the indicated time. Pursuant to subsection (t) "Cone of Silence" of Section 2-11.1 "Conflict of Interest and Code of Ethics Ordinance" of Miami-Dade County, public notice is hereby given that a "Cone of Silence" is imposed concerning this solicitation. The "Cone of Silence" prohibits communications concerning ITB's, RFQ's or Bids, until such time as a written recommendation is presented to the City Mayor and Council concerning the transaction. Procedures regarding the Cone of Silence can be found in the ITB documents. Any questions, requests for information, or clarification pertaining to this ITB must be made in writing by no later than March 1, 2024, by 5:00P.M/(EST) to: Aeemed Jaime, Procurement Specialist, City of Miami Springs, 201 Westward Drive, Miami Springs, FL 33166, Telephone 305-805-5054, Email: jaimea@miamisprings-fl.gov. The scope of the project is to replace and upgrade the stormwater pump station that transfers water from the City's closed canal system to the SFWMD's C-6 Canal. The pump serves as flood control to local residents and businesses located in the WBID 3290 basin, as well as several neighboring communities along South Royal Poinciana, which is a major South-East thoroughfare along Miami Springs. The City of Miami Springs(City) owns, operates, and maintainsthe stormwater managementsystem within itsservice area. The existing pump is performing below capacity, is obsolete, and fails frequently. The main object is that the groundwater table elevation in the area remains high throughout the years as the South Florida Water Management District (SFWMD) keeps the C-6 canal stages elevated enough to provide little to no head for storm water to drain by gravity. Flooding causes pollutants and solids to wash into the canal system and also increases the possibility of exfiltration and infiltration in the sewer lines. The degraded pump capacity has resulted in minor to severe roadway flooding and has threatened private residences and businesses in Hook Square and throughout the basin. The replacement of the pump station will alleviate flooding and help prevent pollutants from entering the C-6 canal. Building enhancements will also be required for the pump house's structure in addition to the replacement of the pump. The Project construction is anticipated to be completed by September 2024. Time is of the essence as to the City answer to question by bidders 05/07/2024 5:00 P.M performance of all obligations. Question Deadline 05/01/2024 at 5:00 PM ET This project considers the needs of the City of Miami Springs to comply with FDEP TMDL requirements as the City is located in WBID 3290 and has an outfall to the Miami Canal- C6, an impaired watershed for dissolved oxygen and Escherichia coli (e.coli) in the water body

Award

Water / Sewer

$285,726.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
41
Bidding Soon
1,089
All Active Projects
445
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2024

September 29, 2024

img_map_placeholder

To Be Determined, Miami Springs, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.