BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Clendenin, West Virginia. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Elk River Clendenin Trailhead Project - Rebid Asphalt pavement parking lot, parking lot striping, concrete sidewalks with curb ramps, concrete curbing, concrete bumper blocks, bicycle rack, park benches, picnic shelter, minor storm sewer improvements, demolition, signage, and landscaping. Bidders on this work will be required to comply with the Presidents Executive Order No 11246 and HUD Section 109, which prohibits discrimination in employment regarding race, creed, color, sex, or national origin. Attention of bidders is also called to Section 3, Segregated Facilities, Title VI, and the conditions of employment to be observed. The Owner reserves the right to reject any and all bids, to waive any informalities in bidding and to accept the bid considered to be in its best interest from the lowest responsible bidder. A certified check, bank draft or a satisfactory bid bond furnished by a solvent surety company authorized to do business in the State of West Virginia in an amount equal to five percent (5%) of the total amount of the bid, payable to the Kanawha County Commission, shall be submitted with each bid. The successful bidder will be required to furnish a satisfactory Payment and Performance Bond, Labor, and Material Bond for 100% of the contract amount and the fee for same shall be included in the bid proposal. Bidders must comply with the requirements for Affirmative Action and Minority Business Enterprises participation as described in the Federal specifications insert to the contract documents. Special provisions will be made by the bidder to show what portions of the bid within each division are supported by Minority Business Enterprise (MBE) work. In addition, bidders may obtain, upon request, information concerning local MBE firms. Although no Disadvantaged Business Enterprise (DBE) goal has been set for this project, the Kanawha County Commission strongly encourages the consideration of DBE's when hiring contractors for this or any sponsored project. Minority, Female and Section 3 owned firms are encouraged to apply. No bid may be withdrawn after the scheduled closing time for the receipt of bids for at least ninety (90) days.

Bid Results

Sidewalks / Parking Lot

$148,358.00

Public - County

Paving, Site Work

12

14

2

6

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
25
Bidding Soon
349
All Active Projects
146
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2024

April 22, 2024

img_map_placeholder

646 Maywood Ave E, Clendenin, WV

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.