BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 17, 2024 at 8:00 PM

Updated April 18, 2024

Site work and paving for a mixed-use development in Greenville, Texas. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Project will include, but not limited to the following: Block pump building with metal roof, 3 booster pumps, sidewalk, fence, diesel generator, 430 LF of 12" PVC water line. Bid Security, Performance and Payment Bonds shall be as set forth in the INSTRUCTIONS FOR BIDDERS The Cash Special Utility District reserves the right to reject any or all bids and to waive any formalities. No Bidder may withdraw his bid within 60 days after the actual bid opening date. Question Deadline 03/08/2024 Any questions about the meaning or intent of the Contract Documents are to be directed to ENGINEER. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by ENGINEER as having received the Bidding Documents. Questions received less than 10 days prior to the date for opening of bids may not be answered.

Award

Water / Sewer

$3,012,629.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
380
Active Projects
176
Bidding Soon
3,673
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2024

April 17, 2024

Project location map

Multiple Locations, Greenville, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.