BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work, paving and outdoor lighting for a mixed-use development in Santa Rosa Beach, Florida. Conceptual plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

SCOPE OF WORK: The proposed project consists of the construction of a battery of asphalt pickleball courts to be located at the west end of the Walton Sports Complex. The Walton Sports Complex is located directly north of Dune Lakes Elementary School at 6435 US Hwy 98 (east of US 331 and west of Inlet Beach). Project construction will consist of earthwork, base preparation, asphalt paving, acrylic surfacing, chain-link fencing, and court lighting. In order to perform work on public contracts, the contractor shall have all licenses and permits required by federal, state, and local statutes, regulations, and ordinances. The last date to submit questions is March 7th, 2024, no later than 12:00 Noon. All questions are to be directed in writing to waljames@co.walton.fl.us. DIRECTING QUESTIONS TO ANY OTHER STAFF, PROJECT ENGINEER AND ANY OTHER PERSON IS PROHIBITED AND WILL RESULT IN BID BEING DISQUALIFIED. Questions received after such date and time will not be answered. The Bidder is responsible for the delivery of its bid. Bids received after the specified day and time will not be opened. To be considered, Bidder must submit bid digitally on a USB THUMB DRIVE, along with ONE ORIGINAL PAPER BID, in a sealed envelope clearly marked "ITB NO: 24-13 Walton Sports Complex Pickleball Courts - Phase 2 " addressed to Bids: Central Purchasing at 176 Montgomery Circle, DeFuniak Springs, FL 32435. Scope: Project construction will consist of earthwork, base preparation, asphalt paving, acrylic surfacing, chain-link fencing, and court lighting. The contract duration is 150 days to substantial completion with an additional 15 days for punch list completion.

Project Abandoned

Playgrounds / Parks / Athletic Fields

$169,000.00

Public - County

Outdoor Lighting, Paving, Site Work

13

7

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
23
Bidding Soon
381
All Active Projects
160
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2024

June 17, 2024

img_map_placeholder

6435 US-98, Santa Rosa Beach, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.