BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 18, 2024 at 8:00 PM

Updated April 20, 2024

Site work and paving for a mixed-use development in Gardner, Kansas. Completed plans call for site work for a retail development; road / highway; and for paving for a road / highway.

The City of Gardner is requesting bids for the South Center Trail replacement. The project includes, but is not limited to, removal of 4,677 of existing asphalt trail to be replaced by a 10 concrete trail on an AB-3 base, along with the installation of 2 ADA ramps. Question Deadline 03/07/2024 at 10:00 AM CT QA to Purchasing Contact: John Trickett, Staff Engineer Phone: 913-856-0920 Email: jtrickett@gardnerkansas.gov The City reserves the right to accept or reject any and all Bids and to waive any technicalities or irregularities therein.

Award

Retail

$633,590.00

Public - City

Paving, Site Work

11

5

2

6

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
87
Bidding Soon
1,185
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

April 15, 2024

Project location map

S Center St, Gardner, KS


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.