Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 14, 2024 at 8:00 PM

Updated March 15, 2024

Site work for a water / sewer project in Carter, Oklahoma. Completed plans call for site work for a water / sewer project.

Beckham Co. RWD #1 - ARPA Storage Tank Rehabilitation and Recoating The complete abrasive blasting and recoating of the interior and exterior of a 16' diameter by 100' tall standpipe and a 70' diameter by 32' tall ground storage tank (GST). The ground storage tank will require temporary potable water tank(s) to boost from and temporary chlorination to feed the entire system while the GST is offline. Coordination with Beckham #1 existing telemetry and chlorine contractors will be required. The Project has an expected duration of 60 days

Bid Results

Water / Sewer

$955,789.00

Public - County

Site Work

6

16

10

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
12
Bidding Soon
127
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2024

April 11, 2024

Project location map

To Be Determined, Carter, OK

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed