Renovation of a municipal facility in Denver, Colorado. Completed plans call for the renovation of a municipal facility.

Date Email Questions Due 03/13/2024 5:00 PM MT. During recent construction/utility work at street level, the concrete cap over a vaulted utility room below grade was penetrated. The condition of the existing concrete cap, adjacent barrel vaulted ceilings, and masonry walls of the room and surrounding tunnel were investigated. While the overall condition and structural integrity of the masonry wall and ceiling are stable, some notable cracks in the masonry, missing masonry, staining and paint failure is evidence of water infiltration. The water infiltration has caused electrical outlets to be abandoned and needs to be addressed to curtail further damage to the structure. This project consists of replacing the structural lid of the tunnel vault to the south of the State Capitol building below the sidewalk. The concrete lid replacement includes waterproofing to protect against water infiltration and enough strength to carry the loads of firetrucks and construction cranes above. The masonry walls contain some notable cracks, missing masonry, staining, and paint failure due to water infiltration and are to be repaired. The Work of Project is defined by the Contract Documents and consists a complete and operational installation, including all tools, equipment, means and methods, rigging, shoring, etc. of the following: 1. Protection of existing masonry construction from damage during demolition and construction activities. 2. Demolition of sidewalk surfaces above south tunnel and vault areas. 3. Excavation of earth above and around south tunnel and vault areas. 4. Evaluate existing brick walls and replace or reinforce with concrete footings and columns. 5. Demolition of concrete lid of south tunnel and vault above stone masonry side walls. 6. Repair damaged stone masonry, including cracks, missing masonry units, missing mortar, staining, paint failure, and other damages to stone masonry. 7. Exterior waterproofing of masonry side walls. 8. Replacement of concrete lid with new 8 reinforced, structural concrete lid, waterproofing, and 4 concrete topping slab. 10. Backfill with compacted engineered fill and replace demolished sidewalk surfaces inkind to match adjacent existing. Anticipated General Contractor Start 04/09/2024 05/13/2024 - On Site Mobilization Anticipated Construction Start/Finish 04/09/2024 - 12/20/2024 BIDDING CONTRACTORS ARE REQUIRED TO SUBMIT ALL QUESTIONS IN WRITING TO: JOY COLEMAN, AIA, WITH TREANORHL, (jcoleman@treanorhl.com, 816-581-4027) BID SECURITY: A bid security of not less than 5% of the bid price is required when the price is estimated to be $50,000 or more. The security shall be a bond by a surety company, the equivalent in cash, or otherwise supplied in a form satisfactory for the State. Noncompliance requires the bid to be rejected as nonresponsive.

Post-Bid

Municipal

$1,400,000.00

Public - State/Provincial

Renovation

16

25

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
112
Bidding Soon
1,651
All Active Projects
683
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 21, 2024

April 9, 2024

December 20, 2024

img_map_placeholder

200 E Colfax Ave, Denver, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.