Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Saginaw, Michigan. Completed plans call for the renovation of a water / sewer project.
The City of Saginaw is soliciting Sealed Bid Proposals for Boiler Replacement at Kochville Station with specifications as shown in bid document. This bid will be considered All or None and No Substitutions will be accepted. 'All or None' means bidders are required to submit pricing for all years and/or all items requested. Any proposal submitted that does not meet this requirement may be disqualified. If said bid is not listed as 'All or None', the City reserves the right to split said bid to our best benefit. 'No Substitutions' means bidders are required to submit pricing for goods/materials as noted in specifications. If the bid does not include no substitutions language, the respective bidder can submit pricing for a substitution and/or alternate. You must identify the brand, model, part number, etc., method or process. Bidders may include supporting documents. The City reserves the right to determine equivalent. Bidders who have questions on this project can contact Ken Manchester, Chief Maintenance Foreman at (989) 759-1640 or email kmanchester@saginaw-mi.com. Obtain all required State of Michigan permits - Demolition and removal of existing Cleaver Brooks hot water heating boiler - remove unit from site - Demolition, removal, and roof repair of existing 14" vent stack - Remove existing system three-way valve and revise piping for primary-secondary piping configuration - Remove and replace existing compression tank with new ASME stamped B&G 40-gallon compression tank, including tank fittings, gauge glass, stand, and supports for tank - Provide one (1) new Lochinvar model FTX725N stainless steel condensing high efficiency hot water supply boiler to be fired on natural gas at a maximum rate of 725 MBH input - Complete site preparation and installation of the new boiler - Complete primary-secondary piping transitions, including addition of boiler primary circulating pump per manufacturer's specification and installation instructions - Install new B&G B7-12 fill valve to replace existing as well as adding 3/4 " swing check valve downstream of new automatic fill valve - Install new sidewall venting and air intake piping per boiler manufacturer's instructions - Install condensate neutralizer and pipe to existing floor drain in boiler room - Complete transitional gas piping to the new boiler - Complete 120 volt, 1 phase, 60 hertz electrical transition to new boiler - Reinsulate all new piping - Install high-capacity automatic air vents on mezzanine supply and return piping for purging air from system - include ball valves for isolation of air vents for future service - Start-up and adjustment of new Lochinvar Boiler per manufacturer's recommended procedures - Complete State of Michigan required annual portion of boiler CSD-1 testing and documentation - Complete owner/user training in the new boiler system - Provide start-up documents and manuals, as required
Award
Water / Sewer
$39,414.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 5, 2024
April 4, 2024
2138 Kochville Rd, Saginaw, MI
Related To This Project
Saginaw, MI
Bid Date: Mar 08 2024
Saginaw, MI
Bid Date: Feb 29 2024
Saginaw, MI
Bid Date: Mar 08 2024
Saginaw, MI
Bid Date: Mar 12 2024
Saginaw, MI
Bid Date: Mar 12 2024
Saginaw, MI
Bid Date: Mar 26 2024
Saginaw, MI
Bid Date: Mar 19 2024
Saginaw, MI
Bid Date: Mar 15 2024
Saginaw, MI
Bid Date: Mar 05 2024
Saginaw, MI
Bid Date: Feb 27 2024
Saginaw, MI
Bid Date: Feb 23 2024
Saginaw, MI
--
Saginaw, MI
Bid Date: Mar 01 2024
Saginaw, MI
Bid Date: Feb 22 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.