BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a mixed-use development in Austin, Texas. Completed plans call for the addition of a transportation facility; for the demolition of a transportation facility; for the renovation of a transportation facility; for site work for a transportation facility; water / sewer project; water / sewer project; water / sewer project; and water / sewer project.

The UICW project involves the expansion or enhancement of existing and newly proposed utilities to meet the growing demands of the airport. The project encompasses utility systems including reclaimed water, storm drainage, water quality pond/deicing pond, detention pond, hydronic piping (chilled and hot water), AUS medium voltage electrical power distribution center, ductbank and electrical distribution system, redundant electrical duct banks, information technology/telecommunications duct banks, and other utility extensions that may be identified as the AEDP program progress and their seamless coordination with other AEDP facilities projects. OVERVIEW The City of Austin (City), hereafter referred to as Owner desires to select a Construction Manager-at-Risk (CMR) firm through a one-step evaluation and selection process. This solicitation complies with applicable City Policy and state of Texas law, including Texas Government Code Title 10, Subtitle F, Chapter 2269. The Owner will select the successful Offeror that offers the best value to the City based on the published Evaluation Criteria. Owner will evaluate and rank each responsive submittal with respect to the published Evaluation Criteria contained in this solicitation expeditiously. Owner may determine that it is optional to interview Offerors prior to making a recommendation to the City Council. The Project budget is currently One hundred twenty million Dollars ($120,000,000) SCOPE OVERVIEW/BACKGROUND INFORMATION Scope overview/background information narrative. The UICW Project involves the expansion or enhancement of existing and newly proposed utilities to meet the growing demands of the airport. The project encompasses utility systems including Austin-Bergstrom International Airport (AUS) medium voltage electrical power distribution center, ductbank, and electrical distribution system, redundant electrical duct banks as an option, information technology/ telecommunications duct banks, storm drainage, water quality pond/deicing pond, detention pond, reclaimed water, hydronic piping (chilled and hot water), and other utility extensions that may be identified as the Airport Expansion and Development Program (AEDP) progress and their seamless coordination with other AEDP facilities projects. Close coordination is crucial between the design and construction phases of the UICW, aligning seamlessly with both ongoing and upcoming strategic projects. Fostering collaboration across different projects for a cohesive and integrated approach is essential. The goal is to minimize disruptions to ongoing operations and activities at the airport. The CMR will play a pivotal role in providing preconstruction services throughout the design development. Subsequently, the CMR will engage in negotiating Guaranteed Maximum Price (GMP) packages for construction. This delivery method is designed to expedite project delivery and enhance coordination and collaboration among the Owner, Design Consultant, and CMR. Success in this role demands the assembly of a highly skilled and experienced team capable of working seamlessly with AUS staff, consultants, and stakeholders. The overarching objective is to achieve excellence in project delivery, aligning with the AEDP's commitment to sustainability and strategic project integration. Ensure compliance with environmental regulations, safety standards, and development guidelines including the Master Development Ordinance for Austin Bergstrom International Airport Ordinance, No. 20230914-101. ANTICIPATED SERVICES Anticipated services narrative. The CMR will execute the following preconstruction services: o Develop a Critical Path Project Schedule for each Phase and establish a Maximum of 730 calendar days for the Overall Project. o Conduct a thorough review of construction design documents and coordinate modifications with the Engineer of Record. o Assist in the formulation of construction phasing strategies. o Implement value engineering, identifying opportunities for schedule, cost reduction, and evaluation of alternatives. o Provide construction cost estimating. o Ensure regulatory compliance, handle permits, and manage documentation. o Develop a Project-specific Quality Control Plan. o Prepare Guaranteed Maximum Price (GMP) Plan and Proposal Packages. o Formulate and submit Bid Proposal packages by the competitive Disadvantaged Business Enterprise (DBE) process. Project Related Questions: Marwa Ayad (512) 974-7181 marwa.ayad@flyaustin.com Solicitation Specific Questions: Michael Williams (512) 974-3066 michael.williams3@austintexas.gov Small Minority Business Resources Questions: Donna Powell-Maddox (512) 974-6668 smbrcompliancedocuments@austintexas.gov

Bid Results

Transportation Terminals

$120,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

3

21

12

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
288
Active Projects
153
Bidding Soon
3,743
All Active Projects
1,423
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.