BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 23, 2025 at 8:00 PM

Updated September 10, 2025

Demolition, site work, paving, asbestos abatement and new construction of a mixed-use development in Canton, Massachusetts. Working plans call for the demolition of a educational facility; for the construction of a 218,350-square-foot educational facility; for site work for a educational facility; for asbestos abatement for a educational facility; playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and sidewalk / parking lot.

A construction manager at risk and an architect has been selected. This project is in the pre-construction/negotiated status. If approved this December, the schedule shows the sub-bidding process (beginning with prequalification) will start in the Fall/Winter of 2025, and the schedule shows the start of construction in spring 2026. *The closed solicitation has been included below for reference: Construction Manager at Risk - William H. Galvin Middle School. Estimated Cost $186,000,000. Project specifics: Estimated Total Project Value $232 million; Estimated Construction Value $186 million Construction Duration: +/- 36 months; Project square footage 218,350 sf new construction; and Program scope: New Middle School designed to accommodate grades 5 through 8. Program includes: abatement and demolition of existing school building, new building construction; project site programs includes fields, playground, outdoor areas and parking lots. The SBC, Canton School District, and Town of Canton reserves the right to waive any informality in the RFQ process, to reject any and all SOQ's and to make determinations on CM firms deemed "qualified" in its own discretion to be in the best interest of the Project.

Pre-Construction/Negotiated

Educational

$194,345,100.00

Public - City

Asbestos Abatement, Demolition, New Construction, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
590
Active Projects
344
Bidding Soon
4,216
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.