BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Ontario, Oregon. Completed plans call for the renovation of a detention facility.

This project is complete removal and replacement of the existing Cooling Towers and exterior piping systems including all aspects of the project. The existing concrete support structure shall be used for the new cooling towers with modifications by installing new steel supports on top of concrete. The scope of work for this project is complete removal and replacement of the existing Cooling Towers and exterior piping systems including all aspects of the project. The existing concrete support structure shall be used for the new cooling towers with modifications by installing new steel supports on top of concrete. The condenser water chemical treatment systems shall remain without modification, however this project does include the addition of a spare chemical treatment controller and three chemical feed metering pumps to be provided as spares. Allow Electronic Quote: Yes Informal Bid Flag: No The following range is a project estimate for bonding purposes: $1,400,000-$1,500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project Start Date: Ten (10) Calendar Days from NOTICE TO PROCEED Substantial Completion: Two Hundred Seventy (270) Calendar Days from NOTICE TO PROCEED Final Completion: Three Hundred (300) Calendar Days from NOTICE TO PROCEED Liquidated damages of $450.00 will apply to the contract resulting from this ITB. Failure to substantially complete the Project by the, date of Substantial Completion, as specified in the Contract, will result in damage to the State of Oregon. Moreover, failure to fully complete the Project by the date of Final Completion, as specified in the Contract, will also result in damage to the State of Oregon Since actual damage will be difficult to determine, it is agreed that the Contractor shall pay to the State of Oregon, not as a penalty but as liquidated damages, $450.00 per calendar day elapsed in excess of the Substantial Completion date stated in Section 4 of the Agreement. Moreover, it is agreed that the Contractor shall pay to the State of Oregon, not as a penalty but as liquidated damages, $450.00 per calendar day elapsed in excess of the Final Completion date stated in Section 4 of the Agreement. The single point of contact for questions regarding the ITB, forms, Specifications, Plans, bidding process, change, clarification, the award process, protests, brand approval, or substitution requests and/or any other issues that may arise, is: Ryan N. Kirtley (971) 707-0238 Ryan.N.Kirtley@doc.oregon.gov. OBTAINING ITB DOCUMENTS: This ITB, ITB attachments and any Addenda and notices (Amendments) may be downloaded from the OregonBuys eProcurement system at: https://oregonbuys.gov/bso . Contact the Purchaser identified in OregonBuys for this ITB if unable to access solicitation documents via OregonBuys. Final Completion: Three Hundred (300) Calendar Days from NOTICE TO PROCEED Question Deadline 03/21/2024 at 2:00 PM MT

Award

Jails / Prisons

$1,011,000.00

Public - State/Provincial

Renovation

17

11

3

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
3
Bidding Soon
186
All Active Projects
63
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2024

May 27, 2024

img_map_placeholder

777 Stanton Blvd, Ontario, OR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.