BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a power facility in Gainesville, Florida. Completed plans call for site work for a power facility.

Gainesville Regional Utilities (GRU) is seeking a qualified contractor for repairs to our Deerhaven Generation Station Unit 1 Stack. Contractor must be able to fill and seal the hair line cracks on the exterior surface. repair the interior upper approximately 60' of the gunite refractory liner and repair the brick lining as needed and replace missing sections of the liner as needed and repair/replace the mortar associated with the brick lining in the top 60' and the bottom 5'. Question Submission Deadline:March 15, 2024, 2:00 pm Outer Shell Repair up to 20 square feet of broken or loose outer shell. Disintegrated concrete shall be cut away then scored and coated with a bonding fluid then new mortar applied. Cavities that exceed 1-1/2" in depth and 8" in diameter shall be raked out to a depth where solid concrete is encountered, coated with an approved bonding fluid and mortar applied. Cracks less than 1/8" in width will be sealed with a protective coating. NOTE: Mortar should be three parts clean sand, one part Portland cement, and an approved non-shrink additive. Washdown Wash down each platform will be power washed to remove bird droppings and atmospheric staining. A mild detergent will be applied followed by a high-pressure rinse of water. Acid-Proof Lining Replacement Repair the upper 100' of the liner with a reinforced acid-proof gunite liner. Remove debris from chimney liner interior. Remove the existing gunite liner, remove debris from the chimney and disposed of off-site. Apply a nominal 2" thick application of potassium silicate cement material throughout the entire height of the chimney. The interior surface of the liner will be checked to determine if acidity is present. An alkaline solution will be applied to neutralize the surface if required. T-shaped refractory anchor devices will be attached to the internal surface on 9" horizontal by 9" vertical centers to facilitate retention of the cement product to the internal surface. Anchors will be installed on a staggered pattern with random tine orientation to deter thermal crack projection in the newly installed lining. Apply high temperature asphaltic membrane of approximately 60mils. Preferably Sauereisen No. 89 High-Temperature asphaltic membrane as manufactured by Sauereisen. Then install an application of the high-temperature membrane. Material will be mixed with liquid binder in the proportion specified by the cement manufacturer. Experienced nozzlemen and operators will conduct the guniting operation. The nozzle will be held in such a position that, as nearly as possible, the jet of material is applied at right angles to the surfaces being covered. The lining will be applied in a continuous operation to avoid laminations. The material will be applied to a natural gun finish. Rebound material will not be reused and will be removed and disposed of offsite. When the project is completed all scaffolding and rigging equipment will be removed from the chimney interior, the enlarged cleanout opening will be sealed with cement blocks, and the area will be left in raked-clean condition. Deerhaven Unit 1 Stack Repair have to be complete by 6/22/2024. End of the DH1 outage is 6/24/2024.

Award

Power Plant

$528,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
113
Bidding Soon
1,809
All Active Projects
724
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 4, 2024

May 6, 2024

June 24, 2024

img_map_placeholder

10001 NW 13th St, Gainesville, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.